My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent 2012 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0716
>
8J Consent 2012 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 4:14:14 PM
Creation date
7/11/2012 11:38:57 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/16/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0716 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0716
Reso 2012-087
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sx <br />i! <br />A' City of San Leandro <br />Meeting Date: July 16, 2012 <br />00 Staff Report <br />File Number: 12 -339 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.J. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution of Award of Construction Contract to HP <br />Communications, Inc. for the Fiber Loop Project (Project No. 11- 120 -28 -192) <br />�IIJJihyi /e1 :rail 011 1N;[0]LyiILyiIN101I7e ,II[a]06"] <br />Staff recommends award of a contract to the low bidder, HP Communications, Inc. in the <br />amount of $96,419.00 for the subject project. <br />BACKGROUND <br />The City has been informed that the 1 -880 HOV project is scheduled to commence in Fall <br />2012. The project will add a 3 -mile long High- Occupancy Vehicle (HOV) lane to 1 -880 <br />southbound from Hegenberger Road in Oakland to the Marina Boulevard exit in San Leandro. <br />As part of the project, the 1 -880 interchanges at Davis Street and Marina Boulevard will be <br />reconstructed to allow for the wider freeway. Unfortunately, the project will, for the term of <br />construction, disconnect the fiber optic cables at the east end of the overcrossing on Davis <br />Street, thereby eliminating communication to all of our traffic signals and facilities west of <br />1 -880. <br />By adding fiber optic cables on Washington Avenue between Springlake Drive and Fargo <br />Avenue, the communications going through Davis Street to Doolittle Drive will be routed <br />through East 14th Street, Hesperian Boulevard, Halcyon Drive, Washington Avenue, Fargo <br />Avenue, Farnsworth Street, Manor Boulevard, Wicks Boulevard, Merced Street, Williams <br />Street, and back to Doolittle Drive. The result will be the establishment of a complete <br />redundant fiber optic ring throughout the city. This will allow Engineering staff to maintain <br />communication with traffic signals and facilities located west of 1 -880 during the construction <br />of the 1 -880 HOV project. <br />The work will include pulling fiber optic cable on Washington Avenue between Halcyon Drive <br />and Fargo Avenue. The 288 - strand fiber will be pulled through existing conduit underneath <br />the 1 -880 freeway. New splice connections will be made at the terminations at all signals and <br />City of San Leandro Page 1 Printed on 711012012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.