Laserfiche WebLink
"STORMWATER <br /> OPERATION AND MAINTENANCE PLAN" <br /> For <br /> AutoZone <br /> At <br /> 14844 E. 14 Street <br /> San Leandro, California <br /> Project Information: <br /> • <br /> OVERALL SITE AREA 1.1 -ACRES <br /> Prepared for: <br /> AutoZone Inc. <br /> 123 Front Street <br /> Memphis, TN 38103 <br /> Prepared by: <br /> Yang Consulting Group, Inc. <br /> 108 Santa Rita Court <br /> San Pablo. CA 94806 <br /> (510) 730-2080 <br /> Andrew Yang, PE <br /> May 1, 2012 <br /> Reoorting Period: This report, with the attached inspection and maintenance schedule, documents the <br /> inspections and maintenance of the identified treatment measures during the time period from <br /> to <br />