Laserfiche WebLink
• <br /> . <br /> TABLE - 2 Inspection and Maintenance Schedule <br /> Schedule Observation Maintenance Activity <br /> Before the start of Bio-retentions: <br /> each rainy season • Inspect vegetation for evidence of • Remove any damaged or unstable <br /> and after each hea damage or instability. vegetation and replace in -kind with <br /> rain event. viable vegetation. <br /> • Observe plant growth. Vegetation should • Replace dead plants and replenish <br /> be dense enough to provide filtering and mulch as necessary. Remove fallen <br /> to protect soils from erosion. leaves and debris, prune large <br /> shrubs or trees and mow turf areas <br /> • Inspect vegetation for invasion of plants • Remove any invasive plants, weeds <br /> and weeds. or undesirable vegetation and if <br /> necessary replace in -kind with <br /> viable healthy plantings. <br /> Bio-retention Drain Inlets: <br /> Before the start of • Inspect drain inlets for accumulation of • Remove any debris and sediment. <br /> each rainy season debris and sediment. Clean inlet as necessary. <br /> and after each heavy • Inspect drain inlets for obstructions to • Remove any obstructions to inlet <br /> rain event. inlet and out io including perforated and outlet piping. Clean inlet as <br /> P g g P P P g• <br /> planter drain lines. necessary. <br /> Drainage System Structures: <br /> Before the start of • Inspect drainage structures for • Remove any debris and sediment. <br /> each rainy season accumulation of debris and sediment. Clean inlet as necessary. <br /> and after each heavy • Inspect drain inlets for obstructions to • Remove any obstructions to inlet <br /> rain event. inlet and out piping. and outlet piping. <br /> Building Roof Area: <br /> Before the start of • Inspect roof gutters and downspouts for • Remove any debris and obstructions <br /> each rainy season. accumulation of debris or obstructions. and clean gutters as necessary. <br /> 1 <br /> 't '• 5/1/2012 •1 <br /> 8 -- -— _ <br />