My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2012 Construction Testing Services Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2012
>
Agmt 2012 Construction Testing Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2012 2:56:49 PM
Creation date
11/26/2012 2:56:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/19/2012
Retention
PERM
Document Relationships
Reso 2012-119
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> 1. UNDERSTANDING. The City of San Leandro (City) owns and operates a 7.6 -mgd rated <br /> average dry weather flow (ADWF) Water Pollution Control Plant (WPCP) located in San <br /> Leandro, California. Carollo Engineers (Consultant) has completed design of the Vs/PCP <br /> Rehabilitation Project to restore the capacity and function of the WPCP with improvements to <br /> various existing facilities and by adding new facilities. Construction of the project will be <br /> performed by S.J. Amoroso Construction Co.. Inc. Construction Management of the project will <br /> be provided by the City. This contract is to provide additional Special Inspection as required for <br /> the construction of the aforementioned improvements. Inspections are to be performed as <br /> required by the plans and specifications, by code compliance, and by the project manager. This <br /> Scope of Services is based on a construction period of 690 working days (approximately 32 <br /> months) from Contractor's notice to proceed. <br /> 2. SCOPE OF WORK – INSPECTIONS. <br /> Onsite Testing and Inspections (820 inspection hours have been budgeted for this task): <br /> a. Reinforced Concrete – Footings, grade beams, walls, columns, slab on grade, other <br /> b. Structural Masonry <br /> c. Epoxy Bolts /Proof Load <br /> d. Field Welding <br /> e. NACE coating inspections <br /> Soils Testing and Inspections (483 inspection hours have been budgeted for this task): <br /> a. Earthwork/compaction <br /> A 5% project management and admin fee will be charged monthly per invoice. <br /> 3. TIME OF PERFORMANCE. <br /> a. Job site inspection hours are Monday through Friday 6am to 6pm, observations and <br /> inspections will be scheduled during these hours. Observations or inspections scheduled <br /> outside of these hours shall be charged as described in Exhibit "B" <br /> b. Consultant shall be given a written schedule of work; changes to the schedule shall be issued <br /> at least 48 hours in advance of the work. <br /> c. Consultant shall perform observation and inspections within 48 hours of request by City. <br /> Consulting Services Agreement between Project No. 08- 593-52 -239 <br /> City of San Leandro and CTS, Inc. — Exhibit A Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.