My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2013 0122
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0122
>
10A Action 2013 0122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2013 2:38:40 PM
Creation date
1/16/2013 2:38:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/22/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0122 CSAmended+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0122
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 12-603 <br />project information, and the CIP Committee prioritization . From that information, individual <br />City Councilmembers will rate each project and return their ratings to staff by the end of the <br />day, Friday January 25th. Following the individual rating, staff will summarize the City <br />Councilmember priority list of projects. Then, City Council will meet at the work session on <br />January 28th to discuss the results and to make any modifications that it deems appropriate. <br />Ratings are done based on the merits of each project and not based on cost or potential <br />funding sources. This process provides direction to staff as to the City Council’s vision for <br />major projects, a statement to the public as to the importance placed on various project types, <br />and acts as a guide when seeking grants or lobbying opportunities. <br />It is important to revisit the process from time to time to discuss its merits and issues. <br />Recommendations made to staff regarding this process will be incorporated into future <br />processes. <br />ATTACHMENT(S): <br />None. <br />PREPARED BY: Ken Joseph, City Engineer, Engineering and Transportation Dept . <br />Page 2 City of San Leandro Printed on 1/15/2013
The URL can be used to link to this page
Your browser does not support the video tag.