My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 0122
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0122
>
8F Consent 2013 0122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2013 12:52:36 PM
Creation date
1/16/2013 2:38:53 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/22/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0122 CSAmended+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0122
Reso 2013-002
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />_____________________________________________________________________________________ <br />Consulting Services Agreement between Project No.: 962-86-067 <br />City of San Leandro and Aparc Systems Page 13 <br /> <br />One Market Street, Suite 3600 <br />Vancouver, BC xxxxx <br /> email: kemmons@aparcsystems.com <br /> <br />Any written notice to City shall be sent to: <br />Mr. John O’Driscoll, P. E. <br />835 E. 14th Street <br />San Leandro, Ca 94577 <br />email: jodriscoll@ci.san-leandro.ca.us <br /> <br /> <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br /> <br /> <br />_________________________________________ <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br /> <br /> 10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, C and D represents the entire and integrated <br />agreement between City and Consultant and supersedes all prior negotiations, <br />representations, or agreements, either written or oral. <br /> <br /> Exhibit A Scope of Services <br /> Exhibit B Compensation Schedule & Reimbursable Expenses <br /> Exhibit C Extended Warranty & Support <br />Exhibit D Public Works Requirements <br />Exhibit E Consultant’s Proposal <br /> <br /> <br />10.13 Counterparts. This Agreement may be executed in multiple counterparts, each of which <br />shall be an original and all of which together shall constitute one agreement. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.