My WebLink
|
Help
|
About
|
Sign Out
Home
PowerPoint: 2013 CC Planning Session_PPT
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0126
>
PowerPoint: 2013 CC Planning Session_PPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2013 9:40:19 AM
Creation date
1/24/2013 9:40:07 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/26/2013
Retention
PERM
Document Relationships
PowerPoint: 2013 CC Planning Session_PPT AMENDED
(Superseded by)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0126
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City Council Goal #4 <br />Maintain and enhance the City’s infrastructure. <br />Completed striping contract <br />Coordinating and managing Water Pollution Control Plant (WPCP) <br />rehabilitation project and maintaining a high quality effluent during <br />construction <br />Design of the Triangle intersection improvement project in progress <br />Completed installation of new traffic signals at Bancroft and 136th <br />Avenues; Washington Avenue and Monterey Boulevard signal <br />currently in design phase <br />Reconstructing group picnic areas and replacing the complete <br />irrigation system within Marina Park <br />Starting the construction on San Leandro Boulevard improvements <br />from Davis to Williams Streets as part of the downtown TOD project <br />
The URL can be used to link to this page
Your browser does not support the video tag.