My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2013 0204
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0204
>
3A Public Hearing 2013 0204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2013 12:38:58 PM
Creation date
2/1/2013 12:34:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/4/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0204 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0204
10A Action 2013 0219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0219
MO 2013-006
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Recommended Conditions of Approval February 4, 2013 <br />PLN2012-00039; 13533-13547 Aurora Drive Page 4 of 10 <br />D. Prior to the issuance of the Building Permit, the property owner shall pay the Sewer <br />Connection fee, Engineering Review and Inspection Fees, and other fees as required <br />by City Ordinances and regulations. <br /> <br />E. A Development Fee for Street Improvements (DFSI) is required and is equal to <br />$1221.67 per housing unit. However, a credit for the existing 4 residential units <br />offsets this fee and therefore DFSI fee for 12 units is due. The Marina/I 880 Traffic <br />Impact Fee per residential unit is $614.48 and will be due for 12 units. These fees are <br />subject to change at the start of each fiscal year. <br /> <br />F. A Park Facilities Development Impact Fee of $14,749.69 per unit, for 12 units, shall <br />be paid prior to issuance of a building permit. These fees are subject to change at the <br />start of each fiscal year. <br /> <br />G. Applicant shall service all units via underground facilities and each unit shall have its <br />own utility laterals. <br /> <br />H. Applicant shall remove any broken and uplifted driveway, sidewalk, curb and gutter <br />along the full project frontage and shall construct new City standard driveway, <br />sidewalk, curb and gutter in the same location and alignment as the existing facilities <br />prior to issuance of Certificate of Occupancy. <br /> <br />I. All abandoned driveways shall be removed and replaced with City standard sidewalk, <br />curb and gutter prior to issuance of Certificate of Occupancy. <br /> <br />J. Prior to the issuance of building permits for the project, the Applicant shall obtain an <br />Encroachment Permit from the Engineering and Transportation Department for any <br />work within the public right-of-way. <br /> <br />K. If the design of any site improvements requires encroachments onto neighboring <br />properties during construction, written agreements with that property owner shall be <br />submitted to the City Engineer, for review and approval, prior to issuance of the <br />building permits. <br /> <br />L. Prior to the issuance of the Building Permit, a lot line adjustment shall be submitted <br />and processed through the San Leandro Engineering & Transportation Department for <br />the merger or combining of four parcels in to one parcel. <br /> <br />M. Applicant shall comply with the regulations and provisions contained in the City’s <br />Grading Ordinance, the City’s Storm Water Pollution Prevention Permit, and the <br />National Pollutant Discharge Elimination System (NPDES), to the satisfaction of the <br />City Engineer. More information may be found at www.cleanwaterprogram.org. <br />Stormwater from this site needs to be treated before it is discharged to the storm <br />drain. <br /> <br />N. Runoff from trash enclosures, recycling areas, or similar facilities shall not discharge <br />to the storm drain system. Trash enclosure areas for a dumpster(s) shall be covered <br />and designed to avoid run-on to the trash enclosure area, details subject to the review <br />and approval of the Chief Building Official, City Engineer and Environmental
The URL can be used to link to this page
Your browser does not support the video tag.