My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2013 0204
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0204
>
8D Consent 2013 0204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2013 12:40:33 PM
Creation date
2/1/2013 12:37:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/4/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0204 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0204
Reso 2013-017
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 12-589 <br />reconstruct the asphalt concrete pathways and re-grade the path as necessary to meet <br />Americans with Disabilities Act (ADA) standards. <br />Previous Actions <br />On February 17, 2009, by Resolution No. 2009-023, City Council authorized the application <br />for grant funds from the East Bay Regional Park District under Measure WW, the Park Bond <br />Extension. <br />Applicable General Plan Policies <br />This project is consistent with General Plan Goal No. 21 - Rehabilitation of existing parks <br />policy. <br />Environmental Review <br />A CEQA review was completed for the project and it was determined to be Categorically <br />Exempt in accordance with CEQA section 15301 (Existing Facilities), part (d) for existing <br />bicycle and pedestrian trails. A Notice of Exemption was filed with Alameda County on March <br />20, 2009. <br />Fiscal Impacts <br />The total cost of the Toyon Park Pathway Rehabilitation project is $90,000. Funding for the <br />project is available in account 150-62-115 <br />Construction cost is estimated at $64,000; including contingencies <br />Public Works reports that this project’s maintenance impact is cost neutral <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 2 City of San Leandro Printed on 1/30/2013
The URL can be used to link to this page
Your browser does not support the video tag.