My WebLink
|
Help
|
About
|
Sign Out
Home
2C Presentation 2013 0304
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0304
>
2C Presentation 2013 0304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2013 11:07:11 AM
Creation date
2/27/2013 11:05:37 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/4/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0304 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0304
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />December 21, 2009 Section 4: Transportation and Land Use <br /> <br /> <br /> <br /> <br />Page 29 <br />corridor route, to allow up to 3,431 new living units (residential and mixed use.) The City <br />estimates that 15% of the 3,431 units may be built by 2015 and 90% will be completed by 2030. <br />San Leandro has also secured $24.46 million in Prop 1C funding for this project from the State <br />of California.18 <br />Phase I of San Leandro Crossings includes: <br /> The Alameda: This 1.25 acre development will feature 100 affordable homes in a 4- <br />story residential apartment building over a single-story parking structure. <br /> Cornerstone: Luxury, multi-family rental community will be built in BART‘s East Parking <br />Lot. 200 units are planned here, which will utilize similar architectural features as ―The <br />Alameda.‖ <br /> Replacement Parking Garage: A three-level, 329 space parking garage will be <br />constructed replacing existing parking spaces in BART‘s East Parking Lot. <br /> Master Plan infrastructure upgrades <br />The City is also pursuing development of two additional priority sites identified in the TOD <br />Strategy - 1550 East 14th Street (the former Albertsons) and Town Hall Square (the <br />Davis/Hays/East 14th Street block). In July 2009, the Redevelopment Agency purchased the 1.7 <br />acre former Albertsons site, following demolition of the 26,000 square-foot building, and plans to <br />enter into an exclusive agreement for development of the site consistent with the TOD Strategy <br />which requires greater density including retail along East 14th Street and residential units above. <br />The developer will also be exploring the <br />possibilities of developing the Town Hall Square <br />consistent with the TOD Strategy which requires <br />greater density, including residential, at the site as <br />well. <br />The TOD Strategy also identified the need for <br />additional parking downtown to allow greater <br />development density. The two-story downtown <br />parking garage, which currently has approximately <br />250 spaces, is being replaced by a four-to-five <br />story parking garage. Construction is scheduled to <br />start in 2010. <br /> <br />18 Source: http://www.ci.san-leandro.ca.us/slcrossings.html - City of San Leandro, San Leandro Crossings
The URL can be used to link to this page
Your browser does not support the video tag.