My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2013 0401
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0401
>
3B Public Hearing 2013 0401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2013 4:08:07 PM
Creation date
3/26/2013 5:54:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/1/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0401 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0401
Reso 2013-043
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-138 <br />They include local green/high tech jobs, research and development investment that has the <br />potential to increase sales of new products, which would translate into increased City sales <br />tax revenues, and compliance with state and local mandated policies which promote <br />green/wind energy projects to reduce greenhouse gas emissions, reduce dependence on <br />foreign energy sources and reduce the overall consumption of fossil fuels. <br />Variance Granted <br />Structures covering not more than 10 percent of the ground area covered by the structure <br />may exceed the maximum permitted height in the district where the site is located by no more <br />than 10 feet (Zoning Code Section 4-1658). In the IG District, the maximum permitted height <br />is 50 feet (Zoning Code Section 2-734 C.); thus the maximum permitted height is 60 feet tall. <br />The proposed structure exceeds the 60 foot maximum height limit that the Zoning Code <br />permits in the IG Industrial District. The maximum height for the proposed turbine is 100 feet; <br />the variance that was granted by the BZA exceeds the maximum height limit by 40 feet. <br />Environmental Review <br />The City prepared an Initial Study consistent with CEQA Guidelines section 15063 and <br />determined that a Mitigated Negative Declaration was required for the Project. Based on the <br />Initial Study, the City prepared a Mitigated Negative Declaration (MND) dated May 22, 2012, <br />which was circulated for public review for the required 30-day period. Following a meeting <br />between the applicant and the Heron Bay Homeowners Association on June 20, 2012, the <br />City, with the applicant’s approval , extended the public review period for an additional 40 <br />days, to July 31, 2012. <br />Based on the feedback from the June 20, 2012 meeting and written public comments that <br />were submitted on the MND, the City determined that additional information was needed for <br />the Project. The City prepared a revised MND, dated October 11, 2012, that provided further <br />analysis on the potential for environmental impacts from implementation of the Project <br />including avian and shadow analysis by ESA, an environmental consulting firm. The revised <br />MND superseded the first MND and was circulated for public review for the required 30-day <br />period, ending November 13, 2012. <br />The City received extensive comments on the revised MND from the Heron Bay Homeowners <br />Association through its attorney, including a report from Paul Taylor , as well as comments <br />from the President of the Association . Mr. Taylor was identified by the attorney as an <br />environmental expert. Comments were also received from individuals, including residents of <br />Heron Bay. No comments were received from any public agency during the comment period. <br />Although not required by CEQA, the City prepared written responses to all of the comments <br />on the revised MND in the Responses to Comments document (included in Attachment 3) <br />posted on the City’s website on January 29, 2013. These responses reflect the City’s good <br />faith analysis of the issues raised by the comments. The Responses to Comments do not <br />address any of the comments on the first MND as that MND was superseded and is no longer <br />under consideration. The Responses to Comments includes all of the comment letters <br />received during the public review period and the City’s responses to them . <br />The City carefully reviewed the comments, provided written responses and determined that <br />the comments did not constitute or require substantial revisions to the revised Mitigated <br />Negative Declaration. On these bases, the City determined that no recirculation of the revised <br />Page 5 City of San Leandro Printed on 3/26/2013
The URL can be used to link to this page
Your browser does not support the video tag.