|
SAN LEANDRO ADMINISTRATIVE CODE FINANCE
<br />TITLE 6, Chapter 4 FISCAL YEAR 2014 Proposed FEES
<br />Current Fee Reference Proposed Explanation of FY 2013-14
<br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />Description
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)
<br />4 Plumbing Permit (Continued)
<br />Gas Piping and Oil Piping:
<br />Minimum Fee (one or two outlets)$6.98 $ 7.15
<br />Exemption: Inspection of the installation of an earthquake gas shutoff valve No minimum gas piping and oil piping fee
<br />Each gas outlet over two $3.90 $ 4.00
<br />Each gas meter over one (same time and place)$5.03 $ 5.15
<br />Gas line test, each test $13.95 $ 14.30
<br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new tanks and
<br />piping to building, each
<br />$7.54 $ 7.75
<br />Clothes dryer – residential, each $8.87 $ 9.10
<br />Clothes dryer – commercial, each $10.88 $ 11.15
<br />Hot Water systems, piping and equipment:
<br />For steam or hot water heating piping and radiators, convectors, hot water
<br />panels, steam or hot water unit heaters, clothes pressing machines of any type,
<br />and all connection to industrial and processing equipment:
<br />Minimum fee (first device)$8.87 $ 9.10
<br />Each additional device $11.34 $ 11.65
<br />Boilers:
<br />To 3 h.p., each $15.54 $ 15.95
<br />Over 3 to 15 h.p., each $26.32 $ 27.00
<br />Over 15 to 30 h.p., each $29.50 $ 30.30
<br />Over 30 to 50 h.p., each $44.78 $ 46.00
<br />Over 50 h.p., each $74.54 $ 76.55
<br />Solar system, including collectors, piping, tanks and exchanger, each system $46.22 $ 47.45
<br />Energy Conservation: review of plans and/or energy forms for all buildings subject to the
<br />California Energy Commission’s conservation regulations (when not covered by building
<br />permit)
<br />Direct Cost (1) with a minimum charge of $60.33 Direct Cost (1) with a minimum charge of $62.00
<br />5 Heating, Ventilating and Air Condition or General Mechanical
<br />Filing and Issuance Fee $90.49 plus the amount shown for each heating,
<br />ventilating, and air conditioning item of work and
<br />each general mechanical item of work
<br />For the roughing in of sheet metal or approved circulating air pipe in connection with any
<br />heating or cooling system, including air inlet or outlet connections, registers and
<br />diffusers:Plan Check, when applicable Direct Cost (1)
<br />For new Residential Construction and additions with valuations over $100,000 including
<br />all HVAC, registers, ducts, gas line and vents.
<br />10% of Building Permit Fee
<br />Each register over two $2.87 $ 2.95
<br />Heating, cooling and ventilating appliances:
<br />Gravity or forced air furnace, each (including gas fireplace inserts)$14.77 $ 15.15
<br />Residential air conditioning system $12.26 $ 12.60
<br />Unit heater, each $12.26 $ 12.60
<br />Recessed wall heater, each $12.26 $ 12.60
<br />Suspended space heater, each $12.26 $ 12.60
<br />Gas range – domestic, each $8.87 $ 9.10
<br />Gas range – commercial, each $10.88 $ 11.20
<br />Gas clothes dryer, domestic, each $8.87 $ 9.10
<br />Gas clothes dryer, commercial, each $10.88 $ 11.20
<br />Gas domestic refrigerator, each $8.87 $ 9.10
<br />Conversion burner, each $10.88 $ 11.20
<br />Circulating type room heater, each $10.88 $ 11.20
<br />Industrial and commercial heating equipment, each $15.18 $ 15.60
<br />Alterations or changes of any control system or ventilating system from original
<br />installation
<br />$12.26 $ 12.60
<br />Small burner of not over 15,000 BTU per hour, steam table sterilizers, laboratory burners,
<br />coffee urn burners, gas plates and similar devices, each
<br />$8.87 $ 9.10
<br />Fans or blowers connected to any heating system which are not part of the furnace, each $8.87 $ 9.10
<br />Commercial range hoods, including vent, each $33.29 $ 34.20
<br />Flues:
<br />Minimum (one or two flues)$10.36 $ 10.65
<br />Each flue over two (each)$6.41 $ 6.60
<br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs
<br />$92.00 plus the amount shown for each heating, ventilating,
<br />and air conditioning item of work and each general mechanical
<br />item of work
<br />G:\BUDGET\2013-14 and 2014-15\Fees\Draft 2014 Proposed Master Fee Schedule 7 4/24/2013
|