My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2013 0506
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0506
>
3B Public Hearing 2013 0506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2013 10:39:32 AM
Creation date
4/30/2013 4:17:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/6/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0506 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0506
PowerPoint 3B&3C Public Hearing 2013 0506
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0506
Reso 2013-055
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-154 <br />escalating operating costs are generally completed on an annual basis. <br />Attached to the resolution accompanying this report is the City of San Leandro Fee Schedule <br />that provides detail of current fees and adjustments, as well as the addition of one new fee <br />from the Public Works department. The proposed charges and new fee are in the right hand <br />column and are printed in bold and italics. <br />The following summarizes departmental changes to the fee schedule for 2013-14: <br />City Wide <br />·AMEND: Audio Tapes amended to Audio Recordings <br />City Clerk <br />·Appeals Fee: increase to $534 and amend explanation to conform with fee in Community <br />Development <br />Community Development <br />·Building Regulations - most fees are increased by the 2.7% CPI change <br />o DECREASED: Residential Seismic Retrofit (increased in error last year, reverted back <br />to original fee of $75.00) <br />·Planning - All fees increased by the 2.7% CPI change <br />Engineering & Transportation <br />·Park facilities development impact fees increased based on shelter component of the CPI <br />factor for San Francisco Bay Area (2.9%) or the Engineering News Record (ENR) <br />construction cost index (2.9%) <br />·Overhead utility conversion increased by ENR for underground utilities factor (2.9%) <br />·Traffic division increases by ENR escalation factor (1.5%) <br />·Adjusted fee: Oversized Vehicles - Red-tipping Driveway > 10”, additional $5.50/foot <br />charge <br />Finance - no change to fees, enhanced descriptions <br />Fire - REMOVED: Planning Review Fee due to non-use <br />Library - no change to fees <br />Police - no change to fees <br />Public Works <br />·Equipment Rental fees are modified based on current vehicle valuation <br />·Marina fees: <br />o Berth rentals are increased by 2.7% as allowed by the Department of Boating and <br />Waterways loan agreement, Article VI, section 5 (C) <br />o Security live aboard permit increased from $157.50/month to $161.75/month <br />·Environmental Services: <br />o Most fees increased by the 2.7% CPI increase <br />Page 2 City of San Leandro Printed on 4/30/2013
The URL can be used to link to this page
Your browser does not support the video tag.