My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2013 0506
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0506
>
3B Public Hearing 2013 0506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2013 10:39:32 AM
Creation date
4/30/2013 4:17:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/6/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0506 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0506
PowerPoint 3B&3C Public Hearing 2013 0506
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0506
Reso 2013-055
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2014 Proposed FEES <br />Current Fee Reference Proposed Explanation of FY 2013-14 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />PUBLIC WORKS SERVICES DEPARTMENT <br />1 Equipment Rental: Per hour rates, excluding driver, for external billing purposes only. <br />Aerial Lift - Large $63.00 $ 65.00 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Aerial Lift - Small (formerly "bucket truck")$35.00 $ 36.00 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Asphalt Grinder $55.00 <br />Backhoe $36.00 <br />Cargo Body $21.50 <br />CCTV Truck $99.00 <br />Chipper, Brush $12.50 <br />Compressor, Air $9.00 <br />Crane Truck $75.00 $ 83.00 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Dump Truck/Diesel, 5/8 yd.$41.00 $ 47.00 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Dump Truck, 2 yd.$14.00 <br />Dump Truck, 3 axle $60.00 <br />Fork Lift $10.50 <br />Loader $49.00 $ 55.00 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Man Lift $29.00 <br />Marker, Traffic Line, Self-Propelled $24.00 <br />Patch Truck $66.00 <br />Pickup, ½ ton $10.00 11.00$ Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Rodder $42.50 <br />Roller $17.25 19.00$ Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Root Pruner $16.00 <br />Sedan $10.00 <br />Sewer Truck $115.00 <br />Spray Emulsion Rig $6.00 <br />Spreader, Asphalt Box $25.50 <br />Street Sweeper $86.00 <br />Street Sweeper, light $22.00 $ 22.75 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Striper $50.50 -$ vehicle retired <br />Stump Cutter $28.00 <br />Tractor $6.50 7.50$ Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Tractor Loader $16.00 16.25$ Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Trash Truck $54.50 <br />Trencher $12.00 <br />Utility Van (formerly "paint van")$36.50 <br />Van $14.00 $ 14.50 Cost based on current <br />replacement value $10 for every <br />$20,000 vehicle value <br />Water Tank Truck $46.50 <br />2 Emergency Call-Out: <br />A. Administration fee $100.00 <br />B. City Personnel Charges Direct Costs (1) <br />3 Parking Meter Rates: <br />A. One/Two Hour Meters <br />-- 4 minutes $0.05 <br />-- 8 minutes $0.10 <br />-- 16 minutes $0.20 <br />-- 20 minutes $0.25 <br />B. 24 Minute Meters <br />(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 14.80% for indirect overhead charges and 52.23% for staff support charges. <br />G:\BUDGET\2013-14 and 2014-15\Fees\Draft 2014 Proposed Master Fee Schedule 22 4/24/2013
The URL can be used to link to this page
Your browser does not support the video tag.