My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2013 0506
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0506
>
3B Public Hearing 2013 0506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2013 10:39:32 AM
Creation date
4/30/2013 4:17:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/6/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0506 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0506
PowerPoint 3B&3C Public Hearing 2013 0506
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0506
Reso 2013-055
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2014 Proposed FEES <br />Current Fee Reference Proposed Explanation of FY 2013-14 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />PUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Division (continued) <br />5 Hazardous Waste On-site Treatment CA Health & Safety Code; Title 27 <br />A. Annual Fees (4) <br />· Permit-by-Rule $955.00 981.00$ <br />· Conditional Authorization $407.00 418.00$ <br />· Conditional Exempt $111.00 114.00$ <br />6 Hazardous Waste Generators CA Health & Safety Code; Title 27 <br />$146.00 - CESQG (7)150.00$ <br />$291.00 - SQG (7)299.00$ <br />$524.00 - LQG (7)538.00$ <br />$146.00 - UWG (7)150.00$ <br />$73.00 - CESQG 0 (7)75.00$ <br />7 CAL-EPA CUPA Surcharge Fee As required by State of California CA Health & Safety Code; Title 27 <br />8 Hazardous Materials File Review :SLAC 6.4.100 <br />A. Photocopying See City-Wide <br />B. Copies of Site Lists $11.00/list 12.00$ <br />9 Late Payment Charges .75% of outstanding balance per month for <br />accounts delinquent 30 days or more. <br />SLAC 6.4.100 <br />10 Plan Review :SLMC 3-3-100 <br />A. City Staff Hourly Rate $128.00/hr.132.00$ <br />B. Outside Contractor Direct Costs plus + 10% <br />C. Recycling Program New Fee $65/hr Fee based on highest cost (fully loaded) <br />for staff to conduct plan review to nearest <br />$ <br />11 Wastewater Pretreatment: <br />A. All Users SLMC 3-15-510 <br />Service Charge – Per Connection SLAC 12.5.110(e) <br />-- Weekly Connection Activity $1,498.00 per month $ 1,538.00 <br />-- Semi-Monthly Activity 749.00 per month $ 769.00 <br />-- Monthly Activity 374.00 per month $ 385.00 <br />-- Bi-Monthly Activity 187.00 per month $ 192.00 <br />-- Quarterly Activity 125.00 per month $ 128.00 <br />-- Semi-Annual Activity 62.00 per month $ 64.00 <br />-- Annual Activity 31.00 per month $ 32.00 <br />-- Biennial Activity 16.00 per month $ 16.00 <br />B. Service Users <br />Sampling Charge and Routine Analysis – Per Sample <br />-- Composite Samples $902.00 926.00$ <br />-- Grab Samples $356.00 366.00$ <br />-- Other Analyses Cost + 10% <br />Permit Fee (Five Year)$1,245.00 1,278.00$ <br />(4) <br />(7)CESQG – Conditionally Exempt Small Quantity Generator – less than 100 kilograms of hazardous waste per month. <br />SQG – Small Quantity Generator – more than or equal to 100 kilograms but less than 1,000 kilograms of hazardous waste per month. <br />LQG – Large Quantity Generator – more than or equal to 1,000 kilograms of hazardous waste per month <br />UWG – Universal Waste Generator <br />CESQG 0 – Zero waste count due to onsite treatment and/or recycling resulting in off-site shipment not counted as hazardous waste. <br />are calculated proportionally based on the monthly fee <br /> <br /> <br />Monthly fee is basis for Service Charge - per connection <br />Monthly fee was increased by 2.7% CPI all other fees <br /> <br />Includes permit processing and two inspections annually (one annual and one reinspection) for compliance with applicable federal and state underground tank and/or hazardous waste laws and regulations and/or the Uniform <br />Fire Code. Additional inspections will be charged at the current hourly rate. <br /> A. Annual Fees for Generators of Hazardous Waste (4) <br />G:\BUDGET\2013-14 and 2014-15\Fees\Draft 2014 Proposed Master Fee Schedule 25 4/24/2013
The URL can be used to link to this page
Your browser does not support the video tag.