My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2013 0520
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0520
>
8K Consent 2013 0520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:54:15 AM
Creation date
5/15/2013 2:11:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0520 RGAmended2
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
Reso 2013-065
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-219 <br />Applicable General Plan Policies <br />Policy 52.07: Ensure that sufficient funding is provided for the ongoing maintenance of <br />City-owned facilities, including streets, street lights, traffic signals, landscaping, street trees, <br />storm drains, public buildings, and other infrastructure. <br />Permits and/or Variances Granted <br />This work will be done under the following permits and/or approvals: <br />·California Department of Fish and Wildlife Authorization (San Leandro Boulevard) <br />·Alameda County Flood Control Permit (both locations) <br />Environmental Review <br />This project is categorically exempt from CEQA per section 15302(c): Replacement or <br />reconstruction of existing utility systems and/or facilities involving negligible or no expansion of <br />capacity. A notice to this effect was filed with the Alameda County Recorder on April 21, 2011. <br />Summary of Public Outreach Efforts <br />There has been no public outreach for the project. Both bridges will remain open to <br />pedestrians and traffic (with traffic control measures ) at all times. <br />Fiscal Impacts <br />This project will cost $190,000; the construction contract is expected to cost $140,000. <br />The project will be funded by Measure B Streets & Roads funds in account 144-38-339 that <br />were authorized in the 11-12 budget. <br />PREPARED BY: Nick Thom, Senior Engineer, Engineering and Transportation Department <br />Page 2 City of San Leandro Printed on 5/14/2013
The URL can be used to link to this page
Your browser does not support the video tag.