My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2013 0520
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0520
>
8L Consent 2013 0520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:54:28 AM
Creation date
5/15/2013 2:11:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0520 RGAmended2
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
Reso 2013-066
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-250 <br />updates the equipment to current standards. <br />Analysis <br />The State of California Department of Transportation (Caltrans), through the HSIP, approved <br />$373,300 in federal funding for the design and construction of the Washington Avenue and <br />Monterey Boulevard/Bradrick Drive Intersection Improvements. The City must commit to a <br />matching fund amount of $46,580 and assure project completion. <br />The HSIP funding was approved by Caltrans for design and construction of improvements at <br />the intersection to provide safer conditions for both pedestrians and vehicular traffic following <br />the HSIP guidelines. New signal equipment will be installed at the Washington Avenue and <br />Monterey Boulevard/Bradrick Drive intersection and the traffic signal will be interconnected <br />with the City’s Traffic Operation Center . <br />Upon the City Council authorizing the City Manager to execute Program Supplement <br />Agreement No. 022-N to the Master Agreement with Caltrans , Local Assistance staff will <br />proceed to make funds available for the design phase of the project. This phase is estimated <br />to cost $73,700. The HSIP grant will provide $66,330, and the City must provide $7,370 as <br />our match for this phase. After completion of the design work, the City must execute a <br />second Program Supplement Agreement for the construction portion of the work . <br />Previous Actions <br />·On February 5, 2007, by Resolution No. 2007-005, the City Council approved the <br />Administering Agency-State Master Agreement for Federal -Aid Projects <br />·On March 5, 2012, by Ordinance No. 2012-003, the City Council amended the City of San <br />Leandro Traffic Code, in Accordance with Chapter 6-1 of the San Leandro Municipal Code, <br />to Eliminate the Left-Turn Restrictions from Washington Avenue onto Monterey Boulevard <br />and Anza Way when the Traffic Signal Upgrade Project is Implemented at the Washington <br />Avenue and Monterey Boulevard Intersection <br />Applicable General Plan Policies <br />·This action is consistent with Streets and Highway Goal No. 16 of the General Plan and <br />Action Item 16.03-A: Funding for Maintenance <br />·This action is consistent with Traffic Safety Goal No . 18 of the General Plan and Action <br />Item 18-02 <br />Summary of Public Outreach Efforts <br />Staff notified the Floresta Homeowners Association , and received a letter and an email from <br />its officials supporting staff’s recommendation of eliminating left -turn restrictions from <br />northbound Washington Avenue onto Monterey Boulevard and Anza Way , a major component <br />of this project. <br />Fiscal Impacts <br />Page 2 City of San Leandro Printed on 5/14/2013
The URL can be used to link to this page
Your browser does not support the video tag.