My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2013 The Planning Center DC&E
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2013
>
Agmt 2013 The Planning Center DC&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:06:35 AM
Creation date
5/30/2013 11:06:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
Reso 2013-061
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> SAN LEANDRO SHORELINE DEVELOPMENT PROJECT EIR <br /> EXHIBIT A: WORK SCOPE AND COSTS <br /> 7. HYDROLOGY AND WATER QUALITY <br /> Based on existing information including topography, environmental and other <br /> documentation provided by the City of San Leandro, Alameda County and other relevant <br /> agencies,TranSystems will evaluate potential impacts from project implementation related to <br /> hydrology, and water quality, including stormwater runoff. The local National Pollutant <br /> Discharge Elimination System Municipal Permit conditions and San Leandro Municipal Code <br /> will require a Stormwater Control Plan that meets the criteria in the most recent version of <br /> the Alameda County Clean Water Program C.3 Stormwater Technical Guidance Manual. <br /> Evaluation of impacts and project requirements will be prepared in accordance with <br /> applicable federal,State,regional,and City regulations. <br /> Available topography, bathymetry, dredging history and sedimentation analyses performed <br /> by Moffat and Nichol for the City of San Leandro, existing facility plans, regulatory permits, <br /> and geotechnical reports from the City's files will be reviewed in our analysis of the hydrology <br /> and water quality aspects of proposed development improvements. <br /> TranSystems will review the proposed development plans and include references and <br /> anticipated impacts of the potential sea level rise, and proposed means to mitigate the <br /> anticipated impacts on the proposed development elements, as well as the existing <br /> infrastructure that is proposed to remain in place. <br /> TranSystems will provide preliminary hydrology and water quality calculations for the site and <br /> prepare a summary of existing and proposed conditions as part of the analysis. <br /> 8. LAND USE AND PLANNING <br /> The Planning Center I DC&E will evaluate the proposed project's relationship to surrounding <br /> land uses and its consistency with relevant adopted policy documents,including the General <br /> Plan, the Zoning Ordinance, and the Airport Land Use Compatibility Plan for the Oakland <br /> International Airport. <br /> 9. NOISE <br /> The Planning Center I DC&E will prepare a noise and vibration analysis for the San Leandro <br /> Shoreline Development Project EIR. This analysis will identify impacts on nearby existing <br /> residential land uses east of the project site area from implementation of the project. The <br /> noise analysis will discuss relevant standards and criteria for noise exposure, including State <br /> of California and City of San Leandro ordinances,policies,and standards. <br /> THE PLANNING CENTER I DC&E 18 <br /> MAY 1,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.