Laserfiche WebLink
• <br /> Signal Perfection Limited, Inc. -A wholly owned subsidiary of AVI-SPL, Inc. 5880 West Las Positas Blvd—Suite 39 <br /> AVI SPL <br /> Pleasanton, CA 94588 <br /> (925)404-0440 Fax (925) 551-7630 <br /> www.avis.l.com <br /> EQUIPMENT LIST <br /> PREPARED FOR Prepared By Barbara Stuller <br /> City of San Leandro Date Prepared: May 31,2013 <br /> 835 East 14th Street Proposal Number: 181661 <br /> San Leandro,CA 94577 Room Name: VTC Option <br /> Michael Hamer Valid Until: July 30,2013 <br /> ITEM QTY MFG MODEL DESCRIPTION UNIT PRICE EXTENDED PRICE <br /> 1 yea 3'`� �r t $0.00 $0.00 <br /> 160 1 VTC System $0.00 $0.00 <br /> 161 1 Cisco CTS-INTP C40 K9 C40 Codec with Microphone,NPP,720p $10,038.89 $10,038.89 <br /> 162 1 Cisco CCPCONPMDNINTP Maintenance, 1 Year $908.67 $908.67 <br /> C40PP1 <br /> 163 1 Cisco CTS-PHD-1080P12XS Bundled 1080p Camera, 12x Zoom $3,611.11 $3,611.11 <br /> 164 1 Cisco CCPCONPMDN180P Maintenance,1 Year $329.96 $329.96 <br /> 12XSPP1 <br /> E.ui.mentTotal $14,888.63 <br /> Installation Materials $1,156.24 <br /> Labor And S stem Warranties $6,332.05 <br /> Direct Costs $0.00 <br /> General&Administrative $781.24 <br /> Subtotal $23,158.16 <br /> Tax $1,369.58 <br /> This entire document and all information enclosed including drawings,specifications and designs is the property of AVI-SPL.Proprietary information <br /> provided to our client or his agents is for the sole purpose of demonstrating AVI-SPL's capabilities and shall be held in confidence.These materials may <br /> not be copied,distributed or disclosed in any way without the sole written permission of an authorized representative of AVI-SPL <br /> Page 5 of 10 <br />