My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 0701
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0701
>
8F Consent 2013 0701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 3:22:43 PM
Creation date
6/26/2013 12:57:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/1/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0701 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0701
Reso 2013-098
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: July 1, 2013 <br />Staff Report <br />Agenda Section:File Number:13-305 CONSENT CALENDAR <br />Agenda Number:8.F. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Approving Plans and Specifications and Calling <br />for Bids for the Westgate Soundwall Repair Project , Project No. 2012.0200 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends approval of the plans and specifications and a call for bids for the subject <br />project. <br />BACKGROUND <br />In April 2011 and again in May 2011, the Police Department reported two incidents involving <br />automobile collisions into the soundwall along the east side of Westgate Parkway . The two <br />separate collisions were both single vehicle collisions with the wall at approximately the same <br />location causing noticeable distress to the wall structure. <br />The soundwall separates Westgate Parkway from the back yards of residential properties <br />along Timothy Drive and Marybelle Avenue . The wall was constructed when the property was <br />a privately owned industrial site but became the City’s responsibility when the right of way was <br />acquired in 1987. <br />Analysis <br />Typically, soundwalls are not intended nor designed to withstand vehicular impact loads. <br />Analysis of the distressed wall has determined that the collisions have damaged the structural <br />integrity at the location of impact necessitating repairs. <br />This project will demolish two adjacent 10-foot wide wall panels. A replacement wall section <br />of similar height and appearance will be constructed and supported on new foundations. The <br />replaced wall section will meet current Building Code requirements for soundwalls. <br />Page 1 City of San Leandro Printed on 6/25/2013
The URL can be used to link to this page
Your browser does not support the video tag.