Laserfiche WebLink
Required Tower Retrofit <br />INSTALL <br />STEEL <br />LINER <br />MOVE <br />VALVES <br />FROM <br />TOWER <br />TO <br />SHAFT <br />RELINE PIPE <br />REPLACE PIPES <br />Tower & Pavilion in 1920’s <br />Scheduled Tower Construction <br />Fall 2014 – Spring 2015 <br />FILL <br />WASTEWAY <br />WITH <br />CONCRETE