<br /> a) Design, construction, and maintenance of Water Circulation and Drainage
<br /> improvements as depicted in that certain document entitled "Water Circulation
<br /> and Drainage Plan" dated July 19, 1991, and prepared by ESA subject to
<br /> regulatory agency amendments;
<br /> b) Design, construction, and maintenance of the Shoreline Trail and trail extension
<br /> through open space lands adjacent to and serving the Heron Bay development;
<br /> C) Design, construction, and maintenance of existing and newly constructed
<br /> shoreline levees, outfalls, tide gates, pumps, maintenance roads, bank
<br /> protection, drainage facilities, and wetland habitats;
<br /> d) Design, construction, reconstruction, and maintenance of levees separating the
<br /> tidal marshlands and open space from the City's 100-acre dredged disposal
<br /> area, and any remedial actions or improvements associated therewith;
<br /> e) Design, construction, and maintenance of levees, weirs, dikes, outfalls, drainage
<br /> facilities, pumps, flap gates, tide gates, and other improvements necessary to
<br /> implement that certain plan entitled WESCO Mitigation Plan dated January, 1992
<br /> (currently identified as the "RMI Mitigation and Monitoring Plan dated May, 1995"
<br /> for the Citation Marsh);
<br /> f) Any other public improvements customarily financed and maintained through
<br /> special assessment proceedings, including but not limited to; streets, sidewalks,
<br /> public rights-of-way, sewers, waterlines, sound walls, traffic signals, signage,
<br /> streetlights, drains, storm water facilities, parks, landscaping, and lift stations;
<br /> g) The sidewalks, landscaping, and sound walls associated with the Lewelling
<br /> Boulevard extension westerly of Wicks Boulevard through the roundabout
<br /> westerly of the Union Pacific Railroad tracks ; and
<br /> h) Portions of the Buffer Zone, which include the Interpretive Center.
<br /> C. Specific Definitions of the District Improvements
<br /> The following definitions shall be applied in their broadest sense when interpreting the
<br /> foregoing items A through H in Section I.B, and for using the assessments collected via
<br /> the Heron Bay Maintenance Assessment District:
<br /> a) Shoreline Trail - The trail, constructed on top of various levees, extending from
<br /> the southerly terminus of the bridge over Estudillo Canal to the northerly terminus
<br /> of the bridge over San Lorenzo Creek, including all surface pavements, base
<br /> rock, signage, striping, and the Interpretive Center and Garden.
<br /> b) Buffer Zone - A strip of land 50 feet wide adjacent with and along the westerly
<br /> boundary of Phase 1 B, and a strip of land 100 feet wide adjacent with and along
<br /> the northerly and westerly boundaries of Phases 2B and 3, including all habitat
<br /> fencing, landscaping, and irrigation within these strips of land, exclusive of the
<br /> passive park along a portion of the northerly boundary of Phase 2B and any
<br /> storm drainage collection systems installed within the Buffer Zone.