My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2013 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0715
>
8D Consent 2013 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 3:14:51 PM
Creation date
7/10/2013 5:14:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/15/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0715 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0715
Reso 2013-105
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />Scope o <br /> <br /> <br /> <br />SCOP <br />This proj <br />The syst <br />the City <br />The follo <br />the follow <br /> <br />City Dep <br />• <br />• <br />• <br />Accela P <br />• <br />• <br />• <br />• <br /> <br />INITIA <br /> <br />PROJE <br />During th <br />as review <br />describe <br />maintain <br /> <br />A Projec <br /> <br />The True <br /> <br />ACCE <br />Accela w <br />environm <br /> <br />of Services – <br /> <br />PE OF SER <br />ject will use a j <br />tem will be imp <br />is prepared to <br />owing sections <br />wing City depa <br />partments <br />Building <br />Planning <br />Engineering <br /> <br />Products <br />Accela Autom <br />Accela Citizen <br />Accela GIS <br />Accela Mobile <br />ATION <br />ECT INITIA <br />he Project Initia <br />w, in conjunctio <br />ed for this enga <br />ned by the True <br />ct Kickoff meeti <br />ePoint Team w <br />LA HOSTE <br />will setup an Ag <br />ments. <br />Tidemark upg <br /> <br />RVICES <br />oint team appr <br />plemented usin <br />maintain the sy <br /> describe the p <br />artments, Accel <br />mation; Land Ma <br />n Access <br />e Office <br />ATION <br />ation stage, the <br />on with the City <br />agement. The d <br />ePoint Team an <br />ng will also tak <br />will provide up t <br />D SITE SET <br />gency for the C <br />grade <br /> P <br />roach to collabo <br />g a combinatio <br />ystem going fo <br />proposed imple <br />a modules and <br />anagement Mo <br />e TruePoint Te <br />y project staff, a <br />draft of the proj <br />nd the City. <br />ke place during <br />o 16 hours of s <br />TUP AND IN <br />City on the Acce <br />Page 5 <br />oratively config <br />on of resources <br />orward by havin <br />mentation serv <br />d add-on produ <br />odule <br />eam will create <br />all project mile <br />ect plan will be <br />g this project st <br />services from th <br />NSTALLAT <br />ela Hosted site <br /> <br />gure and imple <br />s from the City <br />ng hands on ex <br />vices for the Ci <br />ucts: <br /> a project plan <br />stones and de <br />e incorporated <br />age. <br />he Project Initia <br />TION <br />e in the PRODU <br /> <br />ment the Acce <br />and TruePoint <br />xperience durin <br />ty in detail. Th <br />with a critical p <br />liverables that <br />into a Master P <br />ation cost cate <br />UCTION and S <br /> San Leandro <br /> <br />la Automation <br /> Team. This wi <br />ng the configura <br />he project will in <br />path summary, <br />detail the effor <br />Project Plan tha <br />gory <br />UPPORT <br />, CA <br /> software. <br />ill ensure <br />ation. <br />nclude <br /> as well <br />rt <br />at will be <br />
The URL can be used to link to this page
Your browser does not support the video tag.