Laserfiche WebLink
IV. CONSTRUCTION PROVISIONS <br /> A. Construction activity shall not create dust, noise or safety hazards for adjacent <br /> residents and properties. Dirt and mud shall not be tracked onto Adams Avenue, <br /> Bigge Street or Doolittle Drive from the project site during construction. <br /> B. Standard construction dust control procedures, such as wetting, daily roadwashing <br /> and other maintenance functions to control emissions, shall be implemented at all <br /> times during outdoor construction. Dust generating activities such as grading, <br /> excavation, paving etc., shall be scheduled the early morning and other hours when <br /> wind speeds are low. <br /> C. The applicant shall prepare a construction truck route plan that would restrict trucks <br /> to arterial streets that have sufficient pavement section to bear the heavy truck <br /> traffic,- thereby minimizing noise and traffic impacts to the community. The <br /> construction truck route plan shall be reviewed and approved by the City <br /> Engineering and Transportation Department prior to receipt of the grading permit. <br /> D. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m., unless <br /> otherwise approved by the City Engineer. <br /> E. Procedures with the highest noise potential shall be scheduled for daylight hours, <br /> when ambient noise levels are highest. <br /> F. The applicant shall require contractor(s) to employ the quietest equipment or, if not <br /> alternative is available, to muffle/control noise from available equipment. <br /> G. All construction contracts shall include the following requirements: 1) Unpaved <br /> construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br /> hauling construction materials shall be covered with tarpaulins or other effective <br /> covers; 3) Streets surrounding demolition and construction sites shall be swept at <br /> least once per day; and 4) Paving shall be done as soon as possible. City shall <br /> charge developer, and developer shall pay, for all costs of sweeping city streets in <br /> the vicinity of the project as necessary to control dust and spillage. <br /> H. The property shall be secured during demolition and construction with a six (6) foot <br /> tall chain link fence and any other security measures in accordance with <br /> recommendation of the San Leandro Police Department. <br /> V. GENERAL REQUIREMENTS <br /> A. The project site shall be well maintained and shall be kept free of litter, debris and <br /> weeds at all times; during construction, the site shall be well maintained and shall <br /> be kept free of litter, debris and weeds. <br /> B. Any graffiti shall be promptly removed from building walls and/or fences.•The <br /> property owner and its successors in interest shall comply with the rules and <br /> regulations of the City's graffiti removal program and shall grant a license and right <br /> of entry as requested to enforce the terms of such program. <br /> PLN2013-00020 Agreement to Conditions <br /> May 9,2013 Page 6 of 7 <br />