My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 DKS Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 DKS Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 10:07:20 AM
Creation date
8/23/2013 10:07:19 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/15/2002
Retention
PERM
Document Relationships
Reso 2002-103
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product: <br /> • Construction Drawings on City standard 22x34 title block- 70% complete <br /> • Specifications - 70% complete <br /> • Construction Drawings on City standard 22x34 title block— 100% complete <br /> • Specifications— 100% complete <br /> • Construction Drawings on City standard 22x34 title block - Final, stamped and signed <br /> by licensed designers as appropriate, vellum or mylar. <br /> • Specifications—Final <br /> • ACAD v.14 compatible electronic files of the Final Construction Drawings. <br /> • Microsoft word compatible electronic files of the Final specifications <br /> • Project Cost Opinion based on Final Construction Drawings. Paper copy and Microsoft <br /> excel compatible electronic files. <br /> • Supporting calculations (as applicable) <br /> Contractor Tasks: <br /> • Deliver 70% Construction Drawings and Specification documents for review and <br /> comment <br /> • Incorporate comments into 100% CD documents <br /> • Deliver 100% CD documents for final review. <br /> • Incorporate 100%review comments into Final Construction Drawings and Specification <br /> documents <br /> City Tasks: <br /> • Review and comment 70% Construction Drawings and Specification documents. <br /> • Final review and comment of 100% Construction Drawings and Specification <br /> documents. <br /> • Deliver Specification Boilerplate documents. <br /> • Deliver Electronic Aerial Photo Documents as required. <br /> 4. Construction Support <br /> Provide interpretation, clarification, and additional information as required to respond to requests for <br /> information and to install the work. Review submittals, attend meetings as required,review deficiency <br /> list created by others and recommend corrective action as appropriate. Provide input as required to <br /> coordinate final connection at City Hall. <br /> Submittals shall be reviewed and returned within ten(10) calendar days of receipt. Requests for <br /> information shall be responded to within seven(7) calendar days of receipt. <br /> Fiber Installation Nextlink Manor/Farnsworth Exhibit A <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.