My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2013 0916
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0916
>
3A Public Hearing 2013 0916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2013 2:10:28 PM
Creation date
9/11/2013 4:31:25 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/16/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0916 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0916
Reso 2013-114
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />DRAFT Consolidated Annual Performance and Evaluation Report: FY 2012-2013 <br />City of San Leandro <br />Page 19 <br /> <br /> Spectrum Community Services (Spectrum), which was awarded a CIP loan in FY 2008-2009 <br />for its centralized kitchen project, expended the City’s CDBG CIP loan for architectural and <br />engineering work to renovate and expand the existing kitchen at Josephine Lum Lodge, an <br />affordable senior housing property located in Hayward. Spectrum has selected a general <br />contractor, submitted construction drawings to the County of Alameda Health Departments <br />for approval, and worked with the City of Hayward to obtain building permits. Spectrum <br />anticipates completing all fundraising efforts by December 2013 and commencing <br />construction in the beginning of 2014. <br /> <br /> The construction of tenant improvements (drywall, plumbing, electrical, HVAC, and <br />architectural finishes) at the child care center at Cornerstone at San Leandro Crossings, <br />previously The Alameda at San Leandro Crossings project, still has not yet begun. As <br />already explained above, the construction of the proposed affordable rental housing <br />development, which has been redesigned to construct 200 units instead of the original 100- <br />unit plan, is not scheduled to commence until Summer 2014. <br /> <br />Other miscellaneous activities: <br /> <br /> The City began repaying the $2.5 million Section 108 Loan that HUD provided for the <br />construction of the City’s new senior center in accordance with its 20-year repayment <br />schedule. The City made its required payments on August 2012 and February 2013 this past <br />fiscal year using CDBG funds. <br /> <br />Objective: Provide Economic Opportunity <br /> <br />Priority # 11. Support economic development. <br /> <br />Activities: <br /> Other Activities <br />None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.