|
PG&E Disclaimers: CUSTOMER'S DESIGN OF THE RETROFIT
<br />PROJECT AND SELECTION AND USE OF ENERGY EFFICIENCY
<br />EQUIPMENT, MEASURES AND SELECTION OF CONTRACTORS AND
<br />VENDORS IS AT CUSTOMER'S SOLE DISCRETION AND AT
<br />CUSTOMER'S SOLE RISK, TO THE EXTEI\JT PERMITTED BY
<br />APPLICABLE LAW, PG&E EXPRESSLY AND SPECIFICALLY
<br />DISCLAIMS ANY LIABILITY IN RESPECT OF ANY ADVICE,
<br />INFORMATION OR OTHER INSTRUCTION PROVIDED BY OR ON
<br />BEHALF OF PG&E TO CUSTOMER IN CONNECTION WITH THE
<br />QUALIFIED PROGRAM, PROGRAM OR RETROFIT PROJECT. PG&E
<br />DOES NOT WARRANT OR BEAR ANY RESPONSIBILITY FOR ANY OF
<br />THE FOLLOWING:
<br />a. THE WORK PERFORMED BY CUSTOMER'S CONTRACTOR[S] OR
<br />VENDOR[Sl. THAT THE RETROFIT PROJECT IS APPROPRIATE FOR
<br />THE LOCATION;
<br />b. TH~ RET ROFIT WILL RESULr IN OR YIELD ANY ENERGY
<br />EFFICIENCY SAVINGS OR A SPECIFIC AMOUNT OF ENERGY
<br />EFFICIENCY SAVINGS OR OTHER REDUCTION IN CUSTOMER'S
<br />PG&E UTILITY BILL AFTER COMPLETION OF THE RETROFIT
<br />PROJECT;
<br />Co THE CONTRACTOR'S OR VENDOR'S SERVICES WILL BE TIMELY,
<br />COMPLETE OR ERROR-FREE, OR THAT DEFECTS IN THE RETROFIT
<br />PROJECT WILL BE CORRECTED BY SUCH INDIVIDUALS;
<br />d. ANY ERRORS, OMISSIONS, DEFECTS OR DELAYS IN THE DESIGN
<br />OR CONSTRUCTION OF THE RETROFIT PROJECT OR THE
<br />OPERATION OF ANY ENERGY EFFICIENCY MEASURES INSTALLED
<br />AT THE LOCATION,
<br />Verification: Upon completion of the Retr'ofit Pmject, Customer' shall
<br />r'equest PG&E's post-completiollirlspection and final verification that
<br />the Retmflt Pmject has been completed in confor'mity with the
<br />r'equir'ements of the Qualified Program and that customer' remains
<br />eligible [the "Final Ver'ification"l.
<br />a. If there has been any change to the Retrofit ProJect's scope, cost
<br />and/or Incentives available under the Qualified Program or energy
<br />savings, Customer will be required to enter Into a Loan Modification
<br />Agreement with PG& E, which may include new contract terms
<br />reflectlnq the changes in the Retrofit ProJect. (If a Loan Modification
<br />Agreem~nt is required, it shall be deemed part of the "Loan
<br />Documents,"]
<br />b.lf the changes to the Retmfit PmJect are such that it no longer
<br />meets the Program's payback criteria or other conditions, the
<br />Retrofit Project will be considered ineligible, the Loall Agreement will
<br />be terminated and no loan proceeds will be disbursed,
<br />c.IF PG&E DETERMINES, IN ITS ABSOLUTE DISCRETION, THAT
<br />CUSTOMER'S CREDIT HAS DETERIORATED OR HAS OTHERWISE
<br />PLACED CUSTOMER'S REPAYMENT OF THE LOAN AT RISK, THE
<br />LOAN PROCEEDS SHALL NOT BE ISSUED, EVEN THOUGH THE
<br />RETROFIT PROJECT MAY HAVE BEEN SATISFACTORILY
<br />COMPLETED AT CUSTOMER'S EXPENSE,
<br />Disbursements: Subject to and following PG&E's sEltisfactory FinDI
<br />Verification, an Incentive check and the loan proceeds will be issued
<br />to Customer or, at Customer's written direction, to Customer's
<br />contractor or vendor,
<br />GeneraL Provisions:
<br />a. Applications for loans under the Program will be accepted from
<br />qualified Customers on a first-come, first-served baSIS unH the
<br />funds allocated by PG&E for the Pmgram are no longer available,
<br />The Program may be modified or terminated by the CPUC or PG&E
<br />at any time and without prior notice, However, termination of the
<br />Program follOWing execution of a Loan Agreement by Customer will
<br />not affect that Loan Agreement, or, if Customer thereafter satisfies
<br />all Program conditions. the disbur'sernenl,
<br />b, The loan proceeds may only be used to payor' reimburse
<br />Customer' for' implementirlg 01 installing energy-efficient measures
<br />or equipment through the Qualified Program,
<br />c, If thel'e is any conflict between the tenns of any document r'elatl-1g
<br />to the Program. the Loan Documents shall control,
<br />d. For all retrofit projects, including but not limited to str'eetllght.
<br />HVAC and lighting r'etrofits, Customer acknowledges and
<br />understands that Customer is able to use the installation vendol' or
<br />contractor of their choice,
<br />I have ,ead, understand and agree to all of the Energy Efficiency Retrofit Loan Program requirements and terms and conditions set forth
<br />in this Program deScription, I understand that loan calculations will be based on pre-inspection results and on the applicable prog,am
<br />documentation, and that my agency/company must meet all eligibility criteria and requirements in order to participate in the Program,
<br />Any urlapproved changes to project scope. costs or r'un hour's, or to my agency's/company's creditwurthlness. between the time the loan
<br />Documents ar'e accepted and signed and the Retrofit Project is completed and the pr'oject's and my agency's/cornparlY s continued ellglbllllY
<br />ar'e ver'ified. could r'esult in loan ineligibility,
<br />----'O~~-LL2a~d--" Authorized Representative's Printed Name
<br />/, :;;k. /22-?d~--L:;1•.;:rLe"'-<n _/
<br />Title Date
<br />Tax identification information [select one]:
<br />,XFederal Tax 10 Number: -;f"/-6cJ?pd r-<v
<br />I] Social Security Number: ____________
<br />FOR PG&E USE ONLY:
<br />PG&E OBF Administrator Printed Name Date
<br />Retrofit Program Application Number OBFApplication Number
<br />"PG&E" refers to Pacific Gas and Electric Company. a subsidiary of PG&E Corporation. ©201 1 Pacific Gas and Electric Corr.pany. All fights reserved. <br />
<br />These offerings are funded by California utility customers and administered by PG&E under the auspices of the California PubliC Utilities CommiSSion. <br />
<br />PG&E prints its matorials with soy based inks~on recycled paper,O April2Dll CTM-D71D-D66D <br />
<br />Page 2 of 2
|