Laserfiche WebLink
PG&E Disclaimers: CUSTOMER'S DESIGN OF THE RETROFIT <br />PROJECT AND SELECTION AND USE OF ENERGY EFFICIENCY <br />EQUIPMENT, MEASURES AND SELECTION OF CONTRACTORS AND <br />VENDORS IS AT CUSTOMER'S SOLE DISCRETION AND AT <br />CUSTOMER'S SOLE RISK, TO THE EXTEI\JT PERMITTED BY <br />APPLICABLE LAW, PG&E EXPRESSLY AND SPECIFICALLY <br />DISCLAIMS ANY LIABILITY IN RESPECT OF ANY ADVICE, <br />INFORMATION OR OTHER INSTRUCTION PROVIDED BY OR ON <br />BEHALF OF PG&E TO CUSTOMER IN CONNECTION WITH THE <br />QUALIFIED PROGRAM, PROGRAM OR RETROFIT PROJECT. PG&E <br />DOES NOT WARRANT OR BEAR ANY RESPONSIBILITY FOR ANY OF <br />THE FOLLOWING: <br />a. THE WORK PERFORMED BY CUSTOMER'S CONTRACTOR[S] OR <br />VENDOR[Sl. THAT THE RETROFIT PROJECT IS APPROPRIATE FOR <br />THE LOCATION; <br />b. TH~ RET ROFIT WILL RESULr IN OR YIELD ANY ENERGY <br />EFFICIENCY SAVINGS OR A SPECIFIC AMOUNT OF ENERGY <br />EFFICIENCY SAVINGS OR OTHER REDUCTION IN CUSTOMER'S <br />PG&E UTILITY BILL AFTER COMPLETION OF THE RETROFIT <br />PROJECT; <br />Co THE CONTRACTOR'S OR VENDOR'S SERVICES WILL BE TIMELY, <br />COMPLETE OR ERROR-FREE, OR THAT DEFECTS IN THE RETROFIT <br />PROJECT WILL BE CORRECTED BY SUCH INDIVIDUALS; <br />d. ANY ERRORS, OMISSIONS, DEFECTS OR DELAYS IN THE DESIGN <br />OR CONSTRUCTION OF THE RETROFIT PROJECT OR THE <br />OPERATION OF ANY ENERGY EFFICIENCY MEASURES INSTALLED <br />AT THE LOCATION, <br />Verification: Upon completion of the Retr'ofit Pmject, Customer' shall <br />r'equest PG&E's post-completiollirlspection and final verification that <br />the Retmflt Pmject has been completed in confor'mity with the <br />r'equir'ements of the Qualified Program and that customer' remains <br />eligible [the "Final Ver'ification"l. <br />a. If there has been any change to the Retrofit ProJect's scope, cost <br />and/or Incentives available under the Qualified Program or energy <br />savings, Customer will be required to enter Into a Loan Modification <br />Agreement with PG& E, which may include new contract terms <br />reflectlnq the changes in the Retrofit ProJect. (If a Loan Modification <br />Agreem~nt is required, it shall be deemed part of the "Loan <br />Documents,"] <br />b.lf the changes to the Retmfit PmJect are such that it no longer <br />meets the Program's payback criteria or other conditions, the <br />Retrofit Project will be considered ineligible, the Loall Agreement will <br />be terminated and no loan proceeds will be disbursed, <br />c.IF PG&E DETERMINES, IN ITS ABSOLUTE DISCRETION, THAT <br />CUSTOMER'S CREDIT HAS DETERIORATED OR HAS OTHERWISE <br />PLACED CUSTOMER'S REPAYMENT OF THE LOAN AT RISK, THE <br />LOAN PROCEEDS SHALL NOT BE ISSUED, EVEN THOUGH THE <br />RETROFIT PROJECT MAY HAVE BEEN SATISFACTORILY <br />COMPLETED AT CUSTOMER'S EXPENSE, <br />Disbursements: Subject to and following PG&E's sEltisfactory FinDI <br />Verification, an Incentive check and the loan proceeds will be issued <br />to Customer or, at Customer's written direction, to Customer's <br />contractor or vendor, <br />GeneraL Provisions: <br />a. Applications for loans under the Program will be accepted from <br />qualified Customers on a first-come, first-served baSIS unH the <br />funds allocated by PG&E for the Pmgram are no longer available, <br />The Program may be modified or terminated by the CPUC or PG&E <br />at any time and without prior notice, However, termination of the <br />Program follOWing execution of a Loan Agreement by Customer will <br />not affect that Loan Agreement, or, if Customer thereafter satisfies <br />all Program conditions. the disbur'sernenl, <br />b, The loan proceeds may only be used to payor' reimburse <br />Customer' for' implementirlg 01 installing energy-efficient measures <br />or equipment through the Qualified Program, <br />c, If thel'e is any conflict between the tenns of any document r'elatl-1g <br />to the Program. the Loan Documents shall control, <br />d. For all retrofit projects, including but not limited to str'eetllght. <br />HVAC and lighting r'etrofits, Customer acknowledges and <br />understands that Customer is able to use the installation vendol' or <br />contractor of their choice, <br />I have ,ead, understand and agree to all of the Energy Efficiency Retrofit Loan Program requirements and terms and conditions set forth <br />in this Program deScription, I understand that loan calculations will be based on pre-inspection results and on the applicable prog,am <br />documentation, and that my agency/company must meet all eligibility criteria and requirements in order to participate in the Program, <br />Any urlapproved changes to project scope. costs or r'un hour's, or to my agency's/company's creditwurthlness. between the time the loan <br />Documents ar'e accepted and signed and the Retrofit Project is completed and the pr'oject's and my agency's/cornparlY s continued ellglbllllY <br />ar'e ver'ified. could r'esult in loan ineligibility, <br />----'O~~-LL2a~d--" ­Authorized Representative's Printed Name <br />/, :;;k. /22-?d~--L:;1•.;:rLe"'-<n _/ <br />Title Date <br />Tax identification information [select one]: <br />,XFederal Tax 10 Number: -;f"/-6cJ?pd r-<v <br />I] Social Security Number: ____________ <br />FOR PG&E USE ONLY: <br />PG&E OBF Administrator Printed Name Date <br />Retrofit Program Application Number OBFApplication Number <br />"PG&E" refers to Pacific Gas and Electric Company. a subsidiary of PG&E Corporation. ©201 1 Pacific Gas and Electric Corr.pany. All fights reserved. <br /> <br />These offerings are funded by California utility customers and administered by PG&E under the auspices of the California PubliC Utilities CommiSSion. <br /> <br />PG&E prints its matorials with soy based inks~on recycled paper,O April2Dll CTM-D71D-D66D <br /> <br />Page 2 of 2