Laserfiche WebLink
<br />Facility Audit Report Table of Contents <br />San Leandro WWTF <br /> <br />EXECUTIVE SUMMARY <br />One Energy Efficiency Measure (EEM), a high efficiency aeration blower upgrade (Aeration <br />Blowers EEM), was evaluated at the San Leandro Wastewater Treatment Facility (WWTF), <br />owned and operated by the City of San Leandro. An investment grade audit was performed. <br />The Aeration Blowers EEM showed an attractive simple payback (under six years with <br />incentive). This measure is straightforward, and could be completed in-house in about one <br />year. <br /> <br />Table E1 - San Leandro Energy Efficiency Measure Summary <br /> <br /> <br /> <br />Energy <br />Efficiency <br />Measure <br />(EEM)Description <br />Demand <br />Savings <br />(KW) <br />Energy <br />Savings <br />(Annual <br />KWh) <br />Electrical <br />Cost <br />Savings <br />($/Yr) <br />EEM <br />Capital <br />Cost ($) <br />Simple <br />Payback <br />Period <br />(Years) <br />Incentive <br />Rebate <br />($) <br />Adjusted <br />Payback <br />Period <br />(Years) <br />Aeration <br />Blowers <br />Turbo, PD <br />Blower <br />Retrofit10276,000$29,600 $195,000 6.6$25,800 5.7