My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 1021
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1021
>
8F Consent 2013 1021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2013 9:19:33 AM
Creation date
10/16/2013 4:08:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/21/2013
Retention
PERM
Document Relationships
_CCAgenda 2013 1021 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1021
MO 2013-051
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2013
Reso 2013-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
For the purposes of this section, deferred submittals are defined as those portions of the <br />design that are not submitted at the time of the application and that are to be submitted to <br />the Building Official within a specified period. <br /> <br />Deferral of any submittal items shall have the prior approval of the Building Official. The <br />registered design professional in responsible charge shall list the deferred submittals on <br />the construction documents for review by the Building Official. <br /> <br />Documents for deferred submittal items shall be submitted to the registered design <br />professional in responsible charge who shall review them and forward them to the <br />Building Official with a notation indicating that the deferred submittal documents have <br />been reviewed and been found to be in general conformance to the design of the <br />building. The deferred submittal items shall not be installed until the design and submittal <br />documents have been approved by the Building Official. <br /> <br />107.4 Amended construction documents. <br /> <br />Work shall be installed in accordance with the approved construction documents, and any <br />changes made during construction that are not in compliance with the approved <br />construction documents shall be resubmitted for approval as an amended set of <br />construction documents. <br /> <br />107.5 Retention of construction documents. <br /> <br />One set of approved construction documents shall be retained by the Building Official for <br />a period of not less than 180 days from date of completion of the permitted work, or as <br />required by state or local laws. <br /> <br />SECTION 108 <br />TEMPORARY STRUCTURES AND USES <br /> <br />108.1 General. <br /> <br />The Building Official is authorized to issue a permit for temporary structures and <br />temporary uses. Such permits shall be limited as to time of service, but shall not be <br />permitted for more than 180 days. The Building Official is authorized to grant extensions <br />for demonstrated cause. <br /> <br />108.2 Conformance. <br /> <br />Temporary structures and uses shall conform to the structural strength, fire safety, means <br />of egress, accessibility, light, ventilation and sanitary requirements of this Code as <br />necessary to ensure public health, safety and general welfare. <br /> <br />108.3 Temporary power. <br />
The URL can be used to link to this page
Your browser does not support the video tag.