My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2013 1118
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1118
>
4A Public Hearing 2013 1118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2013 9:23:39 AM
Creation date
11/13/2013 4:44:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/18/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 1118 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1118
Ord 2013-009
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-010
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-011
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-012
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-013
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-014
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-015
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-016
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-017
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-018
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Building Official is satisfied that the proposed work conforms to the requirements of this <br />Code and laws and ordinances applicable thereto, the Building Official shall issue a <br />permit therefor as soon as practicable. <br /> <br /> 105.3.2 Time limitation of application. <br /> <br />An application for a permit for any proposed work shall be deemed to have been <br />abandoned 180 days after the date of filing, unless such application has been pursued in <br />good faith or a permit has been issued; except that the Building Official may extend the <br />time for action based on petition by the applicant detailing circumstances beyond the <br />control of the applicant which have prevented action from being taken. Additional <br />extensions for periods not exceeding 180 days may be authorized. Extensions shall be <br />requested in writing and justifiable cause demonstrated. In order to renew action on an <br />application after expiration, the applicant shall resubmit plans and pay a new plan review <br />fee. <br /> <br />105.4 Validity of permit. <br /> <br />The issuance or granting of a permit shall not be construed to be a permit for, or an <br />approval of, any violation of any of the provisions of this Code or of any other ordinance of <br />the jurisdiction. Permits presuming to give authority to violate or cancel the provisions of <br />this Code or other ordinances of the jurisdiction shall not be valid. The issuance of a <br />permit based on construction documents and other data shall not prevent the Building <br />Official from requiring the correction of errors in the construction documents and other <br />data. The Building Official is authorized to prevent occupancy or use of a structure in <br />violation of this Code or of any other ordinances under the Building Official’s jurisdiction. <br />The Building Official may grant one or more extensions of time for additional periods not <br />exceeding 180 days. The extension shall be requested in writing and justifiable cause <br />demonstrated <br /> <br />105.5 Expiration. <br /> <br />Every permit issued shall become invalid unless the work on the site authorized by such <br />permit is commenced within 180 days after its issuance, or if the work authorized on the <br />site by such permit is suspended or abandoned for a period of 180 days after the time the <br />work is commenced. The Building Official may grant one or more extensions of time for <br />additional periods not exceeding 180 days. The extension shall be requested in writing <br />and justifiable cause demonstrated. <br /> <br />In order to renew action on an application after expiration, the applicant shall resubmit <br />plans and pay a new plan review fee and permit fee. <br /> <br />105.6 Suspension or revocation. <br /> <br />The Building Official is authorized to suspend or revoke a permit issued under the <br />provisions of this Code wherever the permit is issued in error or on the basis of incorrect,
The URL can be used to link to this page
Your browser does not support the video tag.