My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2013 1118
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1118
>
4A Public Hearing 2013 1118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2013 9:23:39 AM
Creation date
11/13/2013 4:44:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/18/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 1118 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1118
Ord 2013-009
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-010
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-011
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-012
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-013
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-014
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-015
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-016
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-017
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
Ord 2013-018
(Reference)
Path:
\City Clerk\City Council\Ordinances\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
The Building Official is authorized to give permission to temporarily supply and use power <br />in part of an electric installation before such installation has been fully completed and the <br />final certificate of completion has been issued. The part covered by the temporary <br />certificate shall comply with the requirements specified for temporary lighting, heat or <br />power in the Electrical Code. <br /> <br />108.4 Termination of approval. <br /> <br />The Building Official is authorized to terminate such permit for a temporary structure or <br />use and to order the temporary structure or use to be discontinued. <br /> <br />SECTION 109 <br />FEES <br /> <br />109.1 Payment of fees. <br /> <br />A permit shall not be valid until the fees prescribed by law have been paid, nor shall an <br />amendment to a permit be released until the additional fee, if any, has been paid. <br /> <br />Fees shall be assessed for permits and associated plan review in accordance with the fee <br />schedule established by the San Leandro City Council as set forth in Chapter 4 of the <br />San Leandro Administrative Code. <br /> <br />109.2 Permit fees. <br /> <br />1. General: Fees shall be assessed in accordance with the provisions of this section. <br /> <br />2. Permit Fees: The fee for each permit shall be as set forth in this section. The <br />determination of value or valuation under any of the provisions of this Code shall <br />be made by the Building Official. The value to be used in computing the building <br />permit and building plan review fees shall be the total value of all construction work <br />for which the permit is issued as well as all finish work, painting, roofing, electrical, <br />plumbing, heating, air conditioning, elevators, fire-extinguishing systems and other <br />permanent equipment. <br /> <br />3. Plan Review Fees: When submittal documents are required by Section 107.1, a <br />plan review shall be paid at the time of submitting the submittal documents for plan <br />review. Said plan review fee shall be eighty percent (80%) of the building permit <br />fee as set forth in the applicable fee schedule resolution adopted by the City <br />Council. <br /> <br />The plan review fees specified in this subsection are separate fees from the permit <br />fees specified in Section 108.2(b) and are in addition to the permit fees. <br /> <br />When submittal documents are incomplete or changed so as to require additional <br />plan review or when the project involves deferred submittal items as defined in
The URL can be used to link to this page
Your browser does not support the video tag.