My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2013 1118
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1118
>
8E Consent 2013 1118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2013 9:24:54 AM
Creation date
11/13/2013 4:46:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/18/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 1118 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1118
Reso 2013-147
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-531 <br />hopes to eventually install updated ramps at all intersections in the City. The City pays the <br />entire cost for the installation of the ramps, repair of sidewalks along the frontage of City <br />facilities, and the sidewalk within curb returns. <br />Analysis <br />A total of three (3) bids were received on October 23, 2013. The bids ranged between <br />$297,985.00 and $588,990.00, with Rosas Brothers Construction submitting the low bid of <br />$297,985.00, which has been determined to be a responsive bid. The engineer’s estimate for <br />construction is $361,682. <br />The exact quantity of work to be done will be determined by the extent of damaged sidewalk <br />that is reported. Staff estimates that this contract will repair 1,200 linear feet of curb and <br />gutter, 8,000 square feet of sidewalk, and install 5,400 square feet of wheelchair ramps along <br />with minor quantities of driveway approaches and other related work. These quantities <br />represent sidewalk, curb and gutter repair at approximately 70 properties and the installation <br />of approximately 54 ADA wheelchair ramps. <br />Applicable General Plan Policies <br />Policy No. 14.07 - Pedestrian Environment; strive to achieve a more comfortable environment <br />for pedestrians in all areas of San Leandro. <br />Environmental Review <br />This project is categorically exempt pursuant to subsection (c) of section 15301 of the CEQA <br />Guidelines. <br />Fiscal Impacts <br />This project is estimated to cost $457,934, including staff time , and will be funded from the <br />approved 2013-14 CIP budget for the Annual Sidewalk Repair Program . 2013-14. <br />Budget Authority <br />Funding for this project is provided in the following accounts: Measure B Bike and Pedestrian <br />Funds, Account No. 144-36-006 ($144,647); Measure B Streets and Roads Funds, Account <br />No. 144-38-006 ($457,035); TDA Grant Funds, Account No. 150-36-005 ($71,654); CDBG <br />Funds, Account No. 165-43-233 ($101,240). <br />ATTACHMENTS <br />Bid Summary <br />PREPARED BY: Austine Osakwe, Senior Engineer, Engineering and Transportation <br />Page 2 City of San Leandro Printed on 11/12/2013
The URL can be used to link to this page
Your browser does not support the video tag.