File Number: 13-531 <br />hopes to eventually install updated ramps at all intersections in the City. The City pays the <br />entire cost for the installation of the ramps, repair of sidewalks along the frontage of City <br />facilities, and the sidewalk within curb returns. <br />Analysis <br />A total of three (3) bids were received on October 23, 2013. The bids ranged between <br />$297,985.00 and $588,990.00, with Rosas Brothers Construction submitting the low bid of <br />$297,985.00, which has been determined to be a responsive bid. The engineer’s estimate for <br />construction is $361,682. <br />The exact quantity of work to be done will be determined by the extent of damaged sidewalk <br />that is reported. Staff estimates that this contract will repair 1,200 linear feet of curb and <br />gutter, 8,000 square feet of sidewalk, and install 5,400 square feet of wheelchair ramps along <br />with minor quantities of driveway approaches and other related work. These quantities <br />represent sidewalk, curb and gutter repair at approximately 70 properties and the installation <br />of approximately 54 ADA wheelchair ramps. <br />Applicable General Plan Policies <br />Policy No. 14.07 - Pedestrian Environment; strive to achieve a more comfortable environment <br />for pedestrians in all areas of San Leandro. <br />Environmental Review <br />This project is categorically exempt pursuant to subsection (c) of section 15301 of the CEQA <br />Guidelines. <br />Fiscal Impacts <br />This project is estimated to cost $457,934, including staff time , and will be funded from the <br />approved 2013-14 CIP budget for the Annual Sidewalk Repair Program . 2013-14. <br />Budget Authority <br />Funding for this project is provided in the following accounts: Measure B Bike and Pedestrian <br />Funds, Account No. 144-36-006 ($144,647); Measure B Streets and Roads Funds, Account <br />No. 144-38-006 ($457,035); TDA Grant Funds, Account No. 150-36-005 ($71,654); CDBG <br />Funds, Account No. 165-43-233 ($101,240). <br />ATTACHMENTS <br />Bid Summary <br />PREPARED BY: Austine Osakwe, Senior Engineer, Engineering and Transportation <br />Page 2 City of San Leandro Printed on 11/12/2013