Laserfiche WebLink
Table 4-A <br /> Special Benefit Services, Funding Source, Costs and Percentage of Annual Budget <br /> Service Funded by Benefit Zone 1 Funded by Benefit Zone 2 <br /> Sidewalk Operations 50%of costs funded by all linear 50%of costs funded by all linear <br /> frontage assessments in zone frontage assessments in zone <br /> 50%of costs funded by lot size 50%of costs funded by lot size <br /> assessments in zone assessments in zone <br /> District Identity Funded by building square Funded by building square <br /> footage assessments spread footage assessments spread <br /> throughout the district equally throughout the district equally <br /> Enhanced Residential Funded by building square Funded by building square <br /> Improvements (future) footage of residential condos footage of residential condos <br /> Admin/Corp Operations Funded by lot size assessments Funded by lot size assessments <br /> spread throughout the district spread throughout the district <br /> equally equally <br /> Contingency Funded by lot size assessments Funded by lot size assessments <br /> spread throughout the district spread throughout the district <br /> equally equally <br /> Table 4-B <br /> Accumulated Cost Assessment for Benefit Zones 1 and 2: <br /> Property Variable Sub-category Benefit Zone 1 Benefit Zone 2 <br /> Linear Frontage $4.1150980 $ 2.5796200 <br /> Lot Size square footage Lot/Sidewalk <br /> (Accumulated costs Operations $0.0490080 $0.0242250 <br /> based upon services) <br /> Lot/Admin $0.0188110 $0.0188110 <br /> Lot/Contingency $0.0047645 $0.0047645 <br /> Total Lot Costs $0.0725835 $ 0.0478005 <br /> Bldg square footage $0.0459850 $ 0.0459850 <br /> Future Residential <br /> Condo $0.20 square foot $0.020 square foot <br /> Building square foot <br /> 20 <br />