Laserfiche WebLink
AN City of San Leandro <br />Meeting Date: January 6, 2014 <br />ONR x419 ` Staff Report <br />File Number: 13-602 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.D. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Accepting the Work for the Bridge Maintenance <br />and Repair 2011 Project, Project Number 12-144-38-339 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends acceptance of the work by American Civil Constructors West Coast, Inc., <br />filing of the Notice of Completion, release of the performance and payment bonds, and <br />release of the maintenance bond upon completion of the one-year maintenance period. <br />BACKGROUND <br />The City owns and maintains several bridges, some of which are periodically inspected by <br />Caltrans. Recent inspection reports for the bridge that carries San Leandro Boulevard over <br />San Leandro Creek indicate that some of the concrete is damaged and that two pipe outfalls <br />have caused erosion under the bridge. Recent inspection reports for the bridge that carries <br />Wicks Boulevard over the Estudillo Canal (located immediately north of Stenzel Park) indicate <br />that small cracks are present in the concrete deck that should be sealed to prevent water <br />entry. <br />San Leandro Boulevard and Wicks Boulevard are both arterial streets within the City. <br />Analysis <br />This project performed the required maintenance on the above described bridges carrying <br />San Leandro Boulevard and Wicks Boulevard. Work was performed in compliance with the <br />contract documents and is now complete. <br />Current Agency Policies <br />Maintain and enhance the City's infrastructure. <br />City of San Leandro Page 1 Printed on 1212312013 <br />