My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2014 0106
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0106
>
8E Consent 2014 0106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:15:25 AM
Creation date
12/23/2013 3:40:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/6/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0106 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0106
Reso 2014-002
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AN City of San Leandro <br />Meeting Date: January 6, 2014 <br />ONR x419 ` Staff Report <br />File Number: 13-604 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.E. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Accepting the Work for the Stenzel Park <br />Drainage Project, Project No. 2003.0720 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends acceptance of the work by Fanfa, Inc., filing of the Notice of Completion, <br />release of the performance and payment bonds, and release of the maintenance bond upon <br />completion of the one year maintenance period. <br />BACKGROUND <br />In the 2010-2011 fiscal year budget, nine projects, including the Stenzel Park Drainage <br />Project, were approved for use of East Bay Regional Park District (EBRPD) Measure WW <br />Park Bond funds as part of the Capital Improvement Program. <br />City Staff noted that rainwater ponded at the northwest portion of ball field #2 at Stenzel Park. <br />This on-going issue, which occurred each winter, reduced the usability of the field and created <br />maintenance problems. <br />This project removed the turf and the upper layer of soil in the ponding area and installed an <br />underground drainage system to increase the field's tolerance for water. The surface was <br />repaired with new top soil and sod. <br />Analysis <br />This project installed the above described improvements at Stenzel Park. Work was <br />performed in compliance with the contract documents and is now complete. <br />A fence will remain around the new sod until mid-January 2014 to protect it from damage <br />while it becomes established. <br />City of San Leandro Page 1 Printed on 1212312013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.