Laserfiche WebLink
J <br />r." <br />_" NGYNFt"R/NG <br />AKGI <br />RAKFPQRF..ZFFQK <br />PROJECT TITLE: Monarch Bay Drive Bridge Repair <br />PROJECT NO.: 12-150-38-324 <br />BID NO.: 12-13.013 <br />BID SUMMARY <br />BID OPENING <br />ENGINEER'S <br />This document is a summary of bids received for the subject project and are <br />Vortex Marine <br />Construction, Inc. <br />provided only as a convenience, Listing of a particular bid is not a finding that <br />Caggiano General <br />Engineering, Inc. <br />such bid has been found to be responsive or accepted as complete by the City. <br />DATE: Wednesday, December 11, <br />TIME: 3:00 p.m. <br />2013 <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />Date Approved: <br />Prepared by: <br />11/20/2013 <br />N. Thom <br />City Manager. Contractors should refer to the contract documents for bidding <br />984 Hensley Street <br />Richmond, CA 94801 <br />3941 Park Drive, Stuite 20-347 <br />EI Dorado Hills, CA 95762 <br />information. <br />LOCATION: City Clerk's Office <br />BID OPENING <br />ENGINEER'S <br />ESTIMATE <br />Vortex Marine <br />Construction, Inc. <br />vv R. Forde Associates <br />Caggiano General <br />Engineering, Inc. <br />DATE: Wednesday, December 11, <br />TIME: 3:00 p.m. <br />2013 <br />Date Approved: <br />Prepared by: <br />11/20/2013 <br />N. Thom <br />Livingston Street Pier <br />Oakland, CA 94606 <br />984 Hensley Street <br />Richmond, CA 94801 <br />3941 Park Drive, Stuite 20-347 <br />EI Dorado Hills, CA 95762 <br />LOCATION: City Clerk's Office <br />Phone: (510) 261-2400 <br />Phone: (510) 215-9338 <br />Phone: (916) 501-0611 <br />Fax: (510) 261-2444 <br />Fax: (510) 215-9867 <br />Fax: (916) 244-0244 <br />ITEM <br />NO. <br />ITEM <br />QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Mobilization per section 9-3.4 <br />1 <br />LS <br />$10,000.00 <br />$101000.00 <br />$48,000.00 <br />$481000.00 <br />$10,000.00 <br />$101000.00 <br />$81000.00 <br />$8,000.00 <br />2 <br />Seal Deck per section 303-1.12 <br />7200 <br />SF <br />$4.00 <br />$283800.00 <br />$8.50 <br />$61,200.00 <br />$10.00 <br />$72,000.00 <br />$13.88 <br />$99,936.00 <br />3 <br />Install Storm Drain per detail 2 <br />2 <br />EA <br />$500.00 <br />$1,000.00 <br />$2,400.00 <br />$41800.00 <br />$3,000.00 <br />$61000.00 <br />$19500.00 <br />$31000.00 <br />sheet 2 <br />4 <br />Clear and Grub per section 300-1 <br />160 <br />TON <br />$106.25 <br />$171000.00 <br />$110.00 <br />$171600.00 <br />$100.00 <br />$161000.00 <br />$125.00 <br />$202000.00 <br />5 <br />Unclassified Excavation per <br />1 <br />LS <br />$26,100.00 <br />$26,100.00 <br />$15,000.00 <br />$152000.00 <br />$50,000.00 <br />$501000.00 <br />$291000.00 <br />$291000.00 <br />section 300-2 and Unclassified <br />Fill per section 3004 <br />6 <br />Grout at abutment per section <br />5 <br />CY <br />$11500.00 <br />$7,500.00 <br />$21200.00 <br />$11,000.00 <br />$2,000.00 <br />$10,000.00 <br />$21500.00 <br />$121500.00 <br />303-8 <br />7 <br />Supply and Install Geotextile <br />1 <br />LS <br />$7,500.00 <br />$71500.00 <br />$2,000.00 <br />$21000.00 <br />$5,000.00 <br />$5,000.00 <br />$2,500.00 <br />$21500.00 <br />fabric per section 300-9 <br />8 <br />Supply and Install Rip Rap per <br />400 <br />TON <br />$300.00 <br />$120,000.00 <br />$150.00 <br />$60,000.00 <br />$145.00 <br />$58,000.00 <br />$142.50 <br />$57,000.00 <br />section 300-11 <br />9 <br />Repair Concrete per section 303- <br />100 <br />SF <br />$125.00 <br />$121500.00 <br />$200.00 <br />$20,000.00 <br />$170.00 <br />$171000.00 <br />$125.00 <br />$12,500.00- <br />1.13 <br />10 <br />Submittals per section 2-5.3 <br />1 <br />LS <br />$41000.00 <br />$4,000.00 <br />$4,000.00 <br />1 $41000.00 <br />1 $41000.00 <br />$41000.00 <br />1 $41000.00 <br />$4,000.00 <br />TOTAL <br />BASE BID: <br />$234,400.00 <br />$243,600.00 <br />$248,000.00 <br />$248,436.00 <br />SUBCONTRACTORS: <br />American Civil <br />Constructors <br />American Civil Constructors <br />Industrial Coating <br />and <br />Restoration Services <br />Monarch Bay Drive Bridge Repair.xlsx Page 1 of 8 Printed 12/12/2013 @ 10:49 AM <br />