<br />PROJECT TITLE: Monarch Bay Drive Bridge Repair
<br />PROJECT NO.: 12-150-38-324
<br />BID NO.: 12-13.013
<br />BID SUMMARY
<br />BID OPENING
<br />Monarch Bay Drive Bridge Repair.xlsx Page 5 of 8 Printed 12/12/2013
<br />ENGINEER'S
<br />This document is a summary of bids received for the subject project and are
<br />Valentine Corporation
<br />Water Rock Construction CorporaLk
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />DATE: Wednesday, December 11,
<br />TIME: 3:00 p.m.
<br />bid has been found to be responsive or accepted as complete by the City. An
<br />Date Approved:
<br />Prepared by:
<br />award of contract, if any, is subject to approval of the City Council and/or the City
<br />111 Pelican Way
<br />San Rafael, CA 94901
<br />1600 Riviera Avenue, Suite 310
<br />Walnut Creek, CA 94596
<br />Manager. Contractors should refer to the contract documents for bidding
<br />LOCATION: City Clerk's Office
<br />information.
<br />Phone: (415) 453-3732
<br />BID OPENING
<br />Monarch Bay Drive Bridge Repair.xlsx Page 5 of 8 Printed 12/12/2013
<br />ENGINEER'S
<br />ESTIMATE
<br />Valentine Corporation
<br />Water Rock Construction CorporaLk
<br />Fanfa, Inc.
<br />DATE: Wednesday, December 11,
<br />TIME: 3:00 p.m.
<br />2013
<br />Date Approved:
<br />Prepared by:
<br />11/20/2013
<br />N. Thom
<br />111 Pelican Way
<br />San Rafael, CA 94901
<br />1600 Riviera Avenue, Suite 310
<br />Walnut Creek, CA 94596
<br />2401 Grant Avenue
<br />San Lorenzo, CA 94580
<br />LOCATION: City Clerk's Office
<br />Phone: (415) 453-3732
<br />Phone: (408) 832-6544
<br />Phone: (510) 278-8410
<br />Fax: (415) 457-5820
<br />Fax: (925)938=1610
<br />Fax: (510) 278-3095
<br />ITEM
<br />NO.
<br />ITEM
<br />QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Mobilization per section 9-3.4
<br />1
<br />LS
<br />$10,000.00
<br />$101000.00
<br />$26,626.00
<br />$26,626.00
<br />$18,000.00
<br />$18,000.00
<br />$41,257.00
<br />$411257.00
<br />2
<br />Seal Deck per section 303-1.12
<br />7200
<br />SF
<br />$4.00
<br />$281800.00
<br />$3.50
<br />$257200.00
<br />$10.00
<br />$721000.00
<br />$6.00
<br />$43,200.00
<br />3
<br />Install Storm Drain per detail 2
<br />2
<br />EA
<br />$500.00
<br />$11000.00
<br />$11500.00
<br />$39000.00
<br />$12,860.00
<br />$259720.00 **
<br />$2,209.00
<br />$41418.00
<br />sheet 2
<br />4
<br />Clear and Grub per section 300-1
<br />160
<br />TON
<br />$106.25
<br />$171000.00
<br />$185.00
<br />$29,600.00
<br />$215.00
<br />$341400.00
<br />$316.00
<br />$50,560.00
<br />5
<br />Unclassified Excavation per
<br />1
<br />LS
<br />$261100.00
<br />$261100.00
<br />$1031443.00
<br />$1031443.00
<br />$361000.00
<br />$36,000.00
<br />$901000.00
<br />$90,000.00
<br />section 300-2 and Unclassified
<br />Fill per section 3004
<br />6
<br />Grout at abutment per section
<br />5
<br />CY
<br />$1,500.00
<br />$72500.00
<br />$11600.00
<br />$8,000.00
<br />$2,500.00
<br />$12,500.00
<br />$4,613.00
<br />$23,065.00
<br />303-8
<br />7
<br />Supply and Install Geotextile
<br />1
<br />LS
<br />$71500.00
<br />$71500.00
<br />$500.00
<br />$500.00
<br />$5,500.00
<br />$5,500.00
<br />$51000.00
<br />$5,000.00
<br />fabric per section 300-9
<br />8
<br />Supply and Install Rip Rapper
<br />400
<br />TON
<br />$300.00
<br />$120,000.00
<br />$225.00
<br />$90,000.00
<br />$165.00
<br />$661000.00
<br />$240.00
<br />$969000.00
<br />section 300-11
<br />9
<br />Repair Concrete per section 303-
<br />100
<br />SF
<br />$125.00
<br />$129500.00
<br />$190.00
<br />$19,000.00
<br />$214.00
<br />$21,400.00
<br />$116.00
<br />$11,600.00
<br />1.13
<br />10
<br />Submittals per section 2-5.3
<br />1
<br />LS
<br />$4,000.00
<br />$4,000.00
<br />$41000.00
<br />$4,000.00
<br />$36,000.00
<br />$361000.00
<br />1 $41000.00
<br />$41000.00
<br />TOTAL
<br />BASE BID:
<br />$2341400.00
<br />$309,369.00
<br />$3279520.00
<br />$369,100.00
<br />SUBCONTRACTORS:
<br />Contractor Chemical
<br />San Jose Transport
<br />Concrete Wall Sawing
<br />All City Trucking
<br />American Civil Contractors
<br />Appian UDBE SWPPP
<br />Mau Trucking
<br />Bay Line
<br />The Pressure Grout
<br />Hazard Concrete
<br />@ 10:49 AM
<br />
|