My WebLink
|
Help
|
About
|
Sign Out
Home
PowerPoint 3B Presentation 2014 0203 San Leandro Blvd Construction
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0203
>
PowerPoint 3B Presentation 2014 0203 San Leandro Blvd Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:23:25 AM
Creation date
2/4/2014 10:14:24 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/3/2014
Retention
PERM
Document Relationships
3B Presentation 2014 0203
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Pro'Objectivesect <br />1 <br />Meet the needs established in the 2007 Transit Oriented <br />(� Development Strategy <br />— Improve safety on San Leandro Blvd between Davis <br />Street and Williams Street <br />Pedestrians - Bicyclists -Vehicles <br />Install on -street parking (66), bike lanes, and an <br />improved landscaped median <br />Widen sidewalks, add sidewalk bulb -outs, improve <br />lighting, and landscaping <br />Add a traffic signal at Parrott Street and make significant <br />accessibility upgrades to the signals at Davis Street,West <br />Juana Avenue, and at the BART Pedestrian crossing <br />` I <br />(UNE Ur A FAIK) 1I <br />° -0-4_-"=6 r -0 -0 -0 <br />-r-) <br />SAN LEANDRO BART STAT10N <br />
The URL can be used to link to this page
Your browser does not support the video tag.