My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2014 0218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0218
>
8F Consent 2014 0218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:18:19 AM
Creation date
2/12/2014 1:20:25 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/18/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0218 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0218
Reso 2014-014
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
sums paid to the Consultant. Consultant understands that, in addition to the foregoing, it <br />may be subject to criminal prosecution for a violation of California Government Code <br />Section 1090 et seq., and, if applicable, will be disqualified from holding public office in the <br />State of California. <br />10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or <br />interview related to this Agreement, either orally or through any written materials. <br />10.9 Contract Administration. This Agreement shall be administered by Kevin Chun <br />("Contract Administrator"). All correspondence shall be directed to or through the Contract <br />Administrator or his or her designee. <br />10.10 Notices. Any written notice to Consultant shall be sent to: <br />Construction Testing Services, Inc. <br />Attn: William Cale <br />2174 Rheem Drive, Suite A <br />Pleasanton, CA 94588 <br />Any written notice to City shall be sent to: <br />City of San Leandro <br />Attn: Kevin Chun, P.E. <br />Engineering and Transportation Department <br />835 East 14th Street <br />San Leandro, CA 94577 <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br />10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, C, D, E represents the entire and -integrated <br />agreement between City and Consultant and supersedes all prior negotiations, <br />representations, or agreements, either written or oral. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and CTS, Inc. Page 12 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.