Laserfiche WebLink
ALIQUOT <br />January 15, 2014 <br />Via Email: rchen@sanleandro.org <br />Mr. Reh-Lin N. Chen, P.E., PTOE <br />Senior Transportation Engineer <br />City of San Leandro <br />San Leandro, CA. 94577 <br />Re: Change Order # 1. Plan revisions. City of San Leandro Bikeway Design P.S. & E. City Project <br />Number 144-36-298 <br />Dear Reh-Lin, <br />In our meetings December 17th and October 301h and various phone discussions and emails, we <br />discussed modifications to the P.S. & E. for the intersection of Floresta Boulevard and Monterey and <br />revisions to the Bikeway plans. The scope of Work and Fee are as follow. <br />Floresta Boulevard and Monterey Intersection: <br />1. Topo survey area impacted by the overlay completed this year <br />2. Redesign intersection due to overlay <br />3. Modify sidewalk area into pavers <br />4. Revise P.S. & E. <br />Bikeway: <br />1. Revisions to the plans per markup. <br />2. Provide details of bicycle signs and poles <br />3. Add additional bicycle network design between San Leandro BART station and future Kaiser <br />Hospital <br />4. Modify Specification <br />Total Fee: $16,000 <br />Thank you and if you have any questions, please do not hesitate to contact me. 510-601-5101 ext. <br />2330. <br />Sincerely, Date <br />Accepted by <br />Robert C. Wong, P.E. <br />RCE No. 43748 <br />Aliquot Associates, Inc. I E-mail: rwong@aliquot.com I Telephone: (925) 476-2300 1 Fax: (925) 476-2350 <br />WALNUT CREEK 1390 S. Main Street, Suite 310 1 Walnut Creek, CA 94596 <br />OAKLAND 460 Boulevard Way, 2nd Floor I Oakland, CA 94610 <br />Planners I Civil Engineers I Traffic Engineers I Surveyors <br />