My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 Aliquot Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 Aliquot Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2014 3:22:35 PM
Creation date
2/22/2014 3:22:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/21/2014
Retention
PERM
Document Relationships
Reso 2014-014
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�) EXHIBIT A <br /> SCOPE OF SERVICES <br /> The scope of work is outlined by tasks to be completed for this study. <br /> Task 1 —Preliminary Information Collection for Kick-Off Meeting <br /> After receiving Notice to Proceed, Aliquot will schedule a kick-off meeting to discuss the overall <br /> project objectives, administration, scope and schedule. Aliquot will present relevant <br /> observations and noteworthy photographs taken by a staff engineer, who will ride the entire 17.7 <br /> mile stretch of proposed new bikeway. Prior to the meeting,Aliquot will review the current <br /> Bicycle Master Plan, City Standard Plans and Specifications, as well as other existing studies and <br /> plans to be provided by the City. Aliquot will meet with the stakeholders to discuss signing, <br /> striping and sharrows preferences that the City and/or Caltrans might have at specific roadways. <br /> If requested, Aliquot will collect data regarding collisions involving bicyclists and also conduct <br /> bicycle counts. <br /> Task 2 —Bikeway Studies <br /> Conduct studies(i.e.,reality checks)to evaluate whether proposed bikeways can be practically <br /> implemented while maintaining adequate handling capacities and safe movements on following <br /> streets that are identified on the Bikeway Project list. Those streets are listed as follows: <br /> C_) • 30-2-d—Davis Street—East 14th Street to San Leandro Blvd <br /> • 30-2-e—Davis Street—San Leandro Blvd to Alvarado St <br /> • 31-3-d—Washington Ave— 143`d Ave to Railroad tracks north of Halcyon Dr <br /> • 31-3-e—Washington Ave—Railroad tracks north of Halcyon Dr to Caliente Dr <br /> • 33-1-c—East 14"' Street—Toler Ave to Southern City limits <br /> • 60-1-a—Fairmont Drive—East 14th St to Hesperian Blvd <br /> • 60-1-c—Halcyon Drive—BART tracks (future East Bay Green Way) to Washington Ave <br /> Conduct formal studies to evaluate whether proposed bikeways can be practically implemented <br /> while maintaining adequate handling capacities and safe movements on following two streets: <br /> • Floresta Blvd and Farnsworth Blvd from Fremont Ave to Corvallis Street- Lane <br /> Reduction and bike lanes. <br /> • San Leandro Blvd from San Leandro Creek to North City limit- Lane Reduction with a <br /> new Center-Two-Way-Left-Turn lane and bike lanes. <br /> Note: City will provide all vehicular traffic counts to Aliquot for aforementioned studies. <br /> Consulting Services Agreement between Project No. 120-28-189 <br /> City of San Leandro and Aliquot Associates--Exhibit A Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.