Laserfiche WebLink
Eft <br /> ALIQUOT <br /> January 15, 2014 <br /> Via Email: rchen @sanleandro.org <br /> Mr. Reh-Lin N. Chen, P.E., PTOE <br /> Senior Transportation Engineer <br /> City of San Leandro <br /> San Leandro, CA. 94577 <br /> Re: Change Order# 1. Plan revisions. City of San Leandro Bikeway Design P.S. & E. City Project <br /> Number 144-36-298 <br /> Dear Reh-Lin, <br /> In our meetings December 17th and October 30th and various phone discussions and emails, we <br /> discussed modifications to the P.S. & E. for the intersection of Floresta Boulevard and Monterey and <br /> revisions to the Bikeway plans. The scope of Work and Fee are as follow. <br /> Floresta Boulevard and Monterey Intersection: <br /> 1. Topo survey area impacted by the overlay completed this year <br /> 2. Redesign intersection due to overlay <br /> 3. Modify sidewalk area into pavers <br /> 4. Revise P.S. & E. <br /> Bikeway: <br /> 1. Revisions to the plans per markup. <br /> 2. Provide details of bicycle signs and poles <br /> 3. Add additional bicycle network design between San Leandro BART station and future Kaiser <br /> Hospital <br /> 4. Modify Specification <br /> Total Fee: $16,000 <br /> Thank you and if you have any questions, please do not hesitate to contact me. 510-601-5101 ext. <br /> 2330. <br /> 0 <br /> Sincerely, Date <br /> Accepted by <br /> Robert C. Wong, P.E. <br /> RCE No. 43748 <br /> Aliquot Associates, Inc. I E-mail: rwong @aliquot.com i Telephone: (925)476-2300 I Fax: (925)476-2350 <br /> WALNUT CREEK 1390 S. Main Street, Suite 310 I Walnut Creek, CA 94596 <br /> OAKLAND 460 Boulevard Way, 2nd Floor I Oakland, CA 94610 <br /> Planners I Civil Engineers I Traffic Engineers I Surveyors <br />