My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2014 0303
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0303
>
10A Action 2014 0303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:57:22 AM
Creation date
3/5/2014 4:45:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/3/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0303 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0303
Reso 2014-017
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
STATE ROUTE 84 FROM 1-58o TO 1-68o <br />($132 M) <br />Two significant improvements are planned for this <br />corridor to complete improvements at the State Route <br />(SR) 84 and I-680 interchange and widening SR 84 to <br />support safety, connectivity and efficiency. <br />1-58o CORRIDOR INVESTMENTS FROM <br />DUBLIN TO SAN JOAQUIN COUNTY LINE <br />($48 M) <br />Investments in the I-580 corridor include <br />improvements to the I -580/I-680 Interchange to <br />provide traffic relief on one of the most significant <br />bottlenecks on the freeway system. Additional <br />funding is for interchange improvements in both East <br />and Central County, including improvements at <br />Vasco Road, Greenville Road and Isabel Avenue, <br />which are needed for major transit investments in the <br />Livermore area, as well as interchange improvements <br />in Central County, focusing on bottleneck relief and <br />safety improvements. <br />TRAFFIC RELIEF ON HIGHWAYS <br />1-68o FROM CONTRA COSTA COUNTY <br />LINE TO THE SANTA CLARA COUNTY <br />LINE ($60 M) <br />Implementation of the I-680 high occupancy <br />vehicle/toll (HOV/HOT) lane in both directions from <br />SR 237 to Alcosta Boulevard is the centerpiece of the <br />improvements planned for this heavily traveled <br />corridor. This project will receive $60 M to construct <br />carpool/HOT lanes on I-680 between Alcosta <br />Boulevard and SR 237 in both directions. <br />1-88o CORRIDOR INVESTMENTS FROM <br />OAKLAND TO UNION CITY ($284 M) <br />I-880 corridor improvements include projects to <br />upgrade and improve key interchanges throughout <br />the corridor beginning with the Broadway/Jackson <br />interchange and Oak Street interchange in Oakland <br />and Alameda to the Whipple/Industrial Parkway <br />Southwest interchange in Hayward and to the <br />County line. Many other interchange projects are also <br />candidates for funding to relieve congestion and <br />improve safety. <br />Funds are included for I-880 Broadway -Jackson <br />multimodal transportation and circulation <br />improvements for Alameda Point, Oakland <br />Chinatown, Downtown Oakland, and Jack <br />London Square. <br />
The URL can be used to link to this page
Your browser does not support the video tag.