Laserfiche WebLink
D. Prior to the issuance of the Building Permit, the property owner shall pay the Sewer <br /> Connection fee, Engineering Review and Inspection Fees, and other fees as required by <br /> City Ordinances and regulations. <br /> E. A Development Fee for Street Improvements (DFSI) is required and is equal to <br /> $1221.67 per housing unit. However, a credit for the existing 4 residential units offsets <br /> this fee and therefore DFSI fee for 12 units is due. The Marina/1 880 Traffic Impact Fee <br /> per residential unit is $614.48 and will be due for 12 units. These fees are subject to <br /> change at the start of each fiscal year. <br /> F. A Park Facilities Development Impact Fee of$14,749.69 per unit, for 12 units, shall be <br /> paid prior to issuance of a building permit. These fees are subject to change at the start <br /> of each fiscal year. <br /> G. Applicant shall service all units via underground facilities and each unit shall have its <br /> own utility laterals. <br /> H. Applicant shall remove any broken and uplifted driveway, sidewalk, curb and gutter <br /> along the full project frontage and shall construct new City standard driveway, <br /> sidewalk, curb and gutter in the same location and alignment as the existing facilities <br /> prior to issuance of Certificate of Occupancy. <br /> I. All abandoned driveways shall be removed and replaced with City standard sidewalk, <br /> curb and gutter prior to issuance of Certificate of Occupancy. <br /> J. Prior to the issuance of building permits for the project, the Applicant shall obtain an <br /> Encroachment Permit from the Engineering and Transportation Department for any <br /> work within the public right-of-way. <br /> K. If the design of any site improvements requires encroachments onto neighboring <br /> properties during construction, written agreements with that property owner shall be <br /> submitted to the City Engineer, for review and approval, prior to issuance of the <br /> building permits. <br /> L. Prior to the issuance of the Building Permit, a lot line adjustment shall be submitted and <br /> processed through the San Leandro Engineering & Transportation Department for the <br /> merger or combining of four parcels in to one parcel. <br /> M. Applicant shall comply with the regulations and provisions contained in the City's <br /> Grading Ordinance, the City's Storm Water Pollution Prevention Permit, and the <br /> National Pollutant Discharge Elimination System (NPDES), to the satisfaction of the <br /> City' Engineer. More information may be found at www.cleanwaterprogram.org. <br /> Stormwater from this site needs to be treated before it is discharged to the storm drain. <br /> N. Runoff from trash enclosures, recycling areas, or similar facilities shall not discharge to <br /> the storm drain system. Trash enclosure areas for a dumpster(s) shall be covered and <br /> designed to avoid run-on to the trash enclosure area, details subject to the review and <br /> approval of the Chief Building Official, City Engineer and Environmental Services <br /> Agreement to Conditions February 4,2013 <br /> PLN2012-00039 Page 6 of 12 <br />