My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2014-008
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2014
>
MO 2014-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:09:22 PM
Creation date
4/10/2014 3:53:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
4/7/2014
Retention
PERM
Document Relationships
4A Public Hearing 2014 0407
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do CITY OF SAN LEANDRO <br /> :� a, = COMMUNITY DEVELOPMENT DEPARTMENT <br /> Planning Services Division <br /> INITIAL STUDY CHECKLIST FORM <br /> 1. Project Title: San Leandro Downtown Technology Campus/Westlake <br /> Development Partners, LLC., Development Agreement Lot Line <br /> Adjustment/Planned Development/Site Plan Review. Planning <br /> Case File: PLN2013-00045 <br /> • 2. Lead Agency Name and Address: City of San Leandro <br /> • 835 East 14th Street <br /> San Leandro, California 94577 <br /> 3. Contact Person and Phone Number: Tom Liao, Planning and Housing Manager <br /> (510) 577-6003 <br /> 4. Project Location: The subject property encompasses an area totaling 317,600 • <br /> square feet, or approximately 7.3 acres (including 1.8 acre of City <br /> right-of-way to be vacated). The site is located generally at 1333 <br /> Martinez Street and bounded by West Estudillo Avenue to the <br /> north, Thornton Street on the south, Alvarado Street on the west <br /> and Martinez Street on the east. The western boundary is adjacent <br /> to the Southern Pacific Railroad right of way.(Alameda County <br /> Assessor Parcel Numbers: 75-47-2, 75-47-7, 75-47-3-2; and 75- <br /> 42-2-1). <br /> 5. Project Sponsor's Name and Address: Gary Wong, President <br /> Westlake Development Partners, LLC <br /> 520 El Camino Real, 9th Floor <br /> San Mateo, California 94402-1722 <br /> 6. General Plan Designation: Transit-Oriented Development Mixed Use <br /> 7. Zoning: DA-5(S)and PS(S) • <br /> 8. Project Description: San Leandro Downtown Technology Campus <br /> The proposed project is a multi-phase, transit-oriented development project located adjacent to the Downtown <br /> San Leandro BART Station. The project will be the first development to implement the City's Transit Oriented <br /> Development Strategy (TOD Strategy) and is being evaluated under the Downtown Transit Oriented Strategy <br /> (TOD) EIR that was certified on September 4, 2007. <br /> • The 7.3-acre project site encompasses four separate parcels, identified as 1333 Martinez Street in this <br /> document. The project site is surrounded by professional office building to the north, industrial uses to the <br /> south, light industrial to the west and the San Leandro BART Station to the east. The site is vacant, relatively <br /> flat and has been previously graded and disturbed. <br /> The proposed project includes the development of an Office/Technology Campus with up to a maximum of <br /> 500,000 square feet of office and other uses located in multiple buildings. The proposed Development <br /> Agreement, Lot Line Adjustment, Planned Development, and Site Plan Review Permit applications are the <br /> subjects of this review. It is expected that development will occur in three or more phases, with a 132,000 <br /> square foot, six-story technology-focused office building and related site improvements proposed in Phase I. <br /> The project will be designed to meet LEED°Gold° requirements. Formal certification may or may not occur. <br /> 'Phase I will also include on-site and off-site improvements including landscaping, bike path, pedestrian path <br /> and utilities. Surface parking will be provided for the development of.Phase I while future phases will require the <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.