Laserfiche WebLink
ATTACHMENTS <br /> A. Cover Sheet with Region and Project Location Map • <br /> B. Proposed Site Plans <br /> C. Proposed Elevations <br /> • <br /> D. Proposed Martinez Street Right-of-Way to be Vacated <br /> E. Proposed Landscape Plans <br /> F. Photographs of Project Site(Existing Conditions) <br /> INITIAL STUDY SOURCES LIST-the following are available online at: <br /> http://www.sanleandro.orR/depts/cd/plan/polplanstudlescega/default.asp <br /> Sources <br /> 1. City of San Leandro General Plan,Adopted May 2002 <br /> 2. Design, Community and Environment, Downtown San Leandro Transit Oriented Development (TOD) <br /> Strategy EIR,Prepared for City of San Leandro,June 5, 2007 <br /> 3. Preliminary Geotechnical Investigation San Leandro Crossing, Rockridge Geotechnical, November 7, <br /> • 2008. Updated October 28,2013(see no. 15 below) • <br /> 4. State of California Seismic Hazard Zones,San Leandro Quadrangle, February 14,2003 <br /> 5. California Geological Survey,Special Publication 117: Guidelines for Evaluating and Mitigating Seismic <br /> Hazards in California, Adopted March 13, 1997 by the State Mining and Geology Board in Accordance <br /> with the Seismic Hazards Mapping Act of 1990 <br /> 6. San Leandro General Plan Update Draft Environmental Impact Report, Prepared by Barry Miller, AICP, <br /> November 2001 <br /> 7. San Leandro Downtown Technology Campus— Traffic Analysis with Attachments, Prepared by Kimley- <br /> Horn and Associates, Inc.,July 15,2013 <br /> 8. Stinson, M.C., M.W. Manson,and J.J. Plappert,Mineral Land Classification: Aggregate Materials in the <br /> San Francisco — Monterey Bay Area, Part II: Classification of Aggregate Resource Areas, South San <br /> Francisco Bay Production — Consumption Region, California Division of Mines and Geology, Special <br /> Report 146, Part II, 1983, 75 maps at scales 1:485,000, 1:250,000, 1:48,000,see Plate 2.40 <br /> 9. Limited Subsurface Investigation Report For 1696 Martinez,prepared by SGI Environmental, May 21, 2013 <br /> 10. Remedial Action Plan, Prepared by IRIS Environmental,January 11, 2010(revised January 27,2010) <br /> 11. Phase ii Environmental Site Assessment-IRIS Environmental-April 9, 2009 <br /> • 12. Step-Out Sampling-San Leandro Crossings- Western Parcel- IRIS Environmental -April 9, 2009 <br /> 13. Phase I Environmental Site Assessment Report for 1333 Martinez Street, Prepared by Stantec Consulting <br /> Corporation,October 21, 2008 <br /> 14. Updated Remedial Action Plan-1333 Martinez Street, Prepared by West Environmental Services and <br /> • Technology December 2013 <br /> 15. Preliminary Geotechnical Investigation—San Leandro Tech Campus, Prepared by Rockridge Geotechnical, <br /> October 28,2013 <br /> 27 <br />