|
ATTACHMENTS
<br /> A. Cover Sheet with Region and Project Location Map •
<br /> B. Proposed Site Plans
<br /> C. Proposed Elevations
<br /> •
<br /> D. Proposed Martinez Street Right-of-Way to be Vacated
<br /> E. Proposed Landscape Plans
<br /> F. Photographs of Project Site(Existing Conditions)
<br /> INITIAL STUDY SOURCES LIST-the following are available online at:
<br /> http://www.sanleandro.orR/depts/cd/plan/polplanstudlescega/default.asp
<br /> Sources
<br /> 1. City of San Leandro General Plan,Adopted May 2002
<br /> 2. Design, Community and Environment, Downtown San Leandro Transit Oriented Development (TOD)
<br /> Strategy EIR,Prepared for City of San Leandro,June 5, 2007
<br /> 3. Preliminary Geotechnical Investigation San Leandro Crossing, Rockridge Geotechnical, November 7,
<br /> • 2008. Updated October 28,2013(see no. 15 below) •
<br /> 4. State of California Seismic Hazard Zones,San Leandro Quadrangle, February 14,2003
<br /> 5. California Geological Survey,Special Publication 117: Guidelines for Evaluating and Mitigating Seismic
<br /> Hazards in California, Adopted March 13, 1997 by the State Mining and Geology Board in Accordance
<br /> with the Seismic Hazards Mapping Act of 1990
<br /> 6. San Leandro General Plan Update Draft Environmental Impact Report, Prepared by Barry Miller, AICP,
<br /> November 2001
<br /> 7. San Leandro Downtown Technology Campus— Traffic Analysis with Attachments, Prepared by Kimley-
<br /> Horn and Associates, Inc.,July 15,2013
<br /> 8. Stinson, M.C., M.W. Manson,and J.J. Plappert,Mineral Land Classification: Aggregate Materials in the
<br /> San Francisco — Monterey Bay Area, Part II: Classification of Aggregate Resource Areas, South San
<br /> Francisco Bay Production — Consumption Region, California Division of Mines and Geology, Special
<br /> Report 146, Part II, 1983, 75 maps at scales 1:485,000, 1:250,000, 1:48,000,see Plate 2.40
<br /> 9. Limited Subsurface Investigation Report For 1696 Martinez,prepared by SGI Environmental, May 21, 2013
<br /> 10. Remedial Action Plan, Prepared by IRIS Environmental,January 11, 2010(revised January 27,2010)
<br /> 11. Phase ii Environmental Site Assessment-IRIS Environmental-April 9, 2009
<br /> • 12. Step-Out Sampling-San Leandro Crossings- Western Parcel- IRIS Environmental -April 9, 2009
<br /> 13. Phase I Environmental Site Assessment Report for 1333 Martinez Street, Prepared by Stantec Consulting
<br /> Corporation,October 21, 2008
<br /> 14. Updated Remedial Action Plan-1333 Martinez Street, Prepared by West Environmental Services and
<br /> • Technology December 2013
<br /> 15. Preliminary Geotechnical Investigation—San Leandro Tech Campus, Prepared by Rockridge Geotechnical,
<br /> October 28,2013
<br /> 27
<br />
|