Laserfiche WebLink
comp' Kimley-Horn <br /> O and Associates,Inc. <br /> Comment#3 <br /> The commenter notes that queues decreased for Cumulative(2030)plus Proposed Project compared to <br /> Existing(2013)plus Project queue and asks for clarification. <br /> The queuing reductions can be attributed to use of a different trip assignment between the two <br /> scenarios. While the broad trip distributions remained consistent,there are multiple routes to reach <br /> each destination,therefore project trips were assigned to alternate routes based on the documented <br /> levels of service.This"reassignment"of trips resulted in a reduction in queuing at these locations. <br /> • <br /> San Leandro Crossings Page 3 of 3 <br /> Response to Caltrans'Comments February 20,2014 <br />