Laserfiche WebLink
1333 Martinez Street,San Leandro,California; Chang Income Property Partnership,LP(property owner)do Westlake Development Partners, LLC(applicant) <br /> DRAFT MITIGATION MONITORING PROGRAM (MMP) <br /> • MONITORING <br /> IMP ACT MITIGATION REQUIRED RESPONSIBILITY TIMING <br /> • Mitigation Measure#9(Continued) <br /> Hazards and Hazardous ❑ Conduct in situ bioremediation measures; or <br /> Materials(Continued) ❑ Implement liquid or vapor extraction measures. <br /> • <br /> The appropriateness of one of the above management City of San Leandro Prior to issuance of Grading <br /> measures over another will depend on many factors, such as the Community Development Permit <br /> type of constituent detected, the size of the identified impacted Department and <br /> area,and the estimated cost of implementing the remedy. Environmental Services <br /> • Division of the Public . <br /> Results of the sampling activities and the 'proposed course of Works Department <br /> action, e.g., no action necessary, soil excavation and off-site <br /> disposal, on-site treatment and soil reuse, shall be reported to a <br /> State environmental regulatory agency and the contractor shall <br /> obtain concurrence before implementing the remedial measures. <br /> Construction activities in the specific area where the unknown <br /> • conditions were identified will resume following the completion of <br /> the additional sampling activities and the implementation of any <br /> required responses. . <br /> • <br /> Any cleanup or remediation shall be required to meet applicable <br /> federal,state and local laws,regulations and requirements. <br /> • • Imported Fill: To minimize the potential introduction of ' <br /> contaminated fill, all imported fill shall have adequate <br /> documentation so it can be verified that the fill source is <br /> appropriate for the site's intended use. Documentation shall • <br /> include detailed information on previous land use of the fill <br /> source, any Phase I Environmental Site Assessments performed <br /> and the findings, and the results of any analytical testing <br /> performed. If no documentation is available or the <br /> documentation is inadequate or if no analytical testing has been <br /> performed,samples of the potential fill material shall be collected <br /> and analyzed. The analyses selected shall be based on the fill <br /> source and knowledge of the previous land use as determined by <br /> the developer's environmental consultant The sample frequency <br /> for potential fill material shall be in accordance with that outlined <br /> in the Department of Toxic Substances Control technical <br /> document titled, "Information Advisory on Clean Imported Fill <br /> Material". The developer's environmental consultant shall <br /> approve the use of imported fill. <br /> • <br /> 1333 Martinez Street,Westlake Office/Technology Campus—Draft MMP Page 9 <br />