My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2014-008
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2014
>
MO 2014-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:09:22 PM
Creation date
4/10/2014 3:53:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
4/7/2014
Retention
PERM
Document Relationships
4A Public Hearing 2014 0407
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1333 Martinez Street,San Leandro,California; Chang Income Property Partnership, LP(property owner)do Westlake Development Partners,LLC(applicant) <br /> DRAFT MITIGATION MONITORING PROGRAM (MMP) <br /> MONITORING <br /> IMPACT MITIGATION REQUIRED RESPONSIBILITY TIMING <br /> • make or cause disturbing,excessive or offensive noise which <br /> • <br /> causes annoyance or discomfort to persons <br /> Public Services <br /> 8. Project will result in #17: The minimum levels of service standards for police and fire City of San Leandro Prior to Final Map <br /> • substantial physical impacts response times shall he maintained in accordance with General Community Development <br /> associated with new or Plan Policy 45.01. Department <br /> physically altered <br /> governmental facilities,the #18: The applicant shall incorporate lighting, landscaping and City of San Leandro Prior to Final Map <br /> construction of which could other design features that reduce the potential for crime and Community Development <br /> cause significant facilitate rapid response to emergency calls in accordance with Department <br /> environmental impacts,in General Plan Policy 45.06. <br /> order to maintain acceptable <br /> • <br /> service ratios,response times <br /> or other performance <br /> objectives for any of the <br /> public services. <br /> Transportation/Traffic • <br /> 9. Project ingress/egress design #19: The significant impact at this intersection during the PM City Traffic Engineer Prior to Final Map <br /> would exacerbate the already peak hour can be mitigated by restriping the eastbound <br /> unacceptable level of service approach to be two lanes, a shared left through lane and a <br /> at San Leandro Boulevard and shared through-right lane. These improvements would occur <br /> Parrott Street during the PM within the existing right-of-way. This mitigation measure results <br /> peak period. Because the San in the intersection operating at LOS E during the PM peak-hour. <br /> Leandro Boulevard/Parrott Therefore,this impact is less than significant. <br /> Street intersection operates at <br /> LOS F under existing <br /> conditions, it is considered an <br /> existing deficiency. <br /> Utilities and Service Systems <br /> 10. • Project will require #20: The applicant shall promote the efficient use of existing . City Engineer Prior to issuance of Grading <br /> construction of new water or water supplies through a variety of water conservation measures, Permit <br /> wastewater facilities,storm including evaluating the potential for the use of recycled water for <br /> water drainage facilities and landscaping in accordance with General Plan Policy 27.02. <br /> result in a determination by <br /> the wastewater treatment '#21: The applicant shall conserve water through the use of such City of.San Leandro Chief Prior to issuance of Building <br /> provider which serves the measures as low-flow plumbing fixtures and water-saving Building Official Permit <br /> project that it has adequate appliances in accordance with General Plan Policy 27.04. <br /> capacity. <br /> #22: The applicant shall be required to pay its fair share of the City Engineer Prior to issuance of Building <br /> cost of improving the water,sewer,drainage and other Permit <br /> 1333 Martinez Street, Westlake Office/Technology Campus—Draft MMP Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.