My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2014-008
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2014
>
MO 2014-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:09:22 PM
Creation date
4/10/2014 3:53:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
4/7/2014
Retention
PERM
Document Relationships
4A Public Hearing 2014 0407
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> P1N2013.00045;San Leandro Downtown Technology Campus/Westlake Development Pamreza LW.;1333 Martinez Street January 2014 <br /> Mitigated Negative Declaration <br /> • <br /> o Soil samples will be collected from the identified area and analyzed <br /> for the likely COPC, depending on the suspected type of <br /> contamination. The sampling strategy will be discussed with a State <br /> environmental regulatory agency prior to the initiation of the • <br /> sampling activities. Analytical results collected from the suspected <br /> source will be compared to the health-based screening levels and <br /> results discussed with a State environmental regulatory agency. If <br /> the levels are below the relevant health-based screening levels and <br /> the State environmental regulatory agency concurs,no additional • <br /> action may be necessary. <br /> o If the soil contains COPCs at levels that exceed the relevant health- �. <br /> • based screening levels, or if the State regulatory agency concludes <br /> that an unacceptable risk to construction worker or future residents <br /> may be present, then management measures, such as the following, <br /> will be undertaken: <br /> • Remove the impacted soil and dispose of off-Site; <br /> • Install a cap to prevent contact with the contamination; <br /> • Install a physical barrier for vapors such as a vapor barrier or <br /> passive venting system,to prevent the accumulation of <br /> • vapors in indoor environment; <br /> • Stockpile soil and aerate on-Site, or in a staging area as may <br /> be appropriate, in compliance with all applicable laws and <br /> regulations; <br /> • Conduct in situ bioremediation measures; or <br /> • • Implement liquid or vapor extraction measures. • <br /> The appropriateness of one of the above management measures over another <br /> will depend on many factors, such as the type of constituent detected,the <br /> size of the identified impacted area; and the estimated cost of implementing <br /> the remedy. <br /> Results of the sampling activities and the proposed course of action,e.g., no <br /> action necessary, soil excavation and off-site disposal, on-site treatment and <br /> soil reuse, shall be reported to a State environmental regulatory agency and <br /> the contractor shall obtain concurrence before implementing the remedial <br /> measures. Construction activities in the specific area where the unknown <br /> conditions were identified will resume following the completion of the <br /> additional sampling activities and the implementation of any required <br /> responses. <br /> Any cleanup or remediation shall be required to meet applicable federal, <br /> state and local laws, regulations and requirements. • <br /> • Imported Fill: To minimize the potential introduction of contaminated <br /> • <br /> fill, all imported fill shall have adequate documentation so it can be <br /> • <br /> verified that the fill source is appropriate for the site's intended use. <br /> • <br /> Documentation shall include detailed information on previous land use <br /> of the fill source, any Phase I Environmental Site Assessments <br /> performed and the findings, and the results of any analytical testing • <br />
The URL can be used to link to this page
Your browser does not support the video tag.